China General Nuclear Power Group
NEA’s 2025 catalog identifies China General Nuclear Power Group as a reactor design developer. Country denotes the catalog headquarters location; current ownership and commercial availability have not been established.
- Projects
- Siting: 2 projects. Furthest recorded stage of 3 as vendor, developer or operator, including 1 earlier-plan record. 4 designs.
- Evidence
- 2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Designs · Tracked projects · Agreements · Ownership · Milestones · Sources · Its projects in the table · Who is involved
Key facts
- Organization type
- Reactor developer
- Category
- vendor
- Country
- China
- Listing status
- State-controlled (not independently listed) · source Profile - CGN · listing checked 6 Nov 2026
- Ownership / control
- State-controlled
CGN's English profile page states the group is controlled by SASAC of the State Council and has five listed companies under it. The page is undated (copyright 2016). - Confidence
- medium
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current activity)
All fields
(3 without a known value)
- Aliases
- None recorded in this release
- Exchange / ticker
- None recorded in this release
- Website
- None recorded in this release
Linked designs
- ACPR50S — Pressurized water reactor (PWR) · SMR
- ACPR100 — Other · SMR
- Huakun One floating reactor platform — Pressurized water reactor (PWR) · SMR
- HuaPeng-1 — Other · SMR
Tracked deployment projects
3 linked project records: 1 announced, 2 siting, counting every project that names this organization in any recorded role (vendor, operator or participant); the developer table counts only projects that use its designs. These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- CGN Bohai ACPR50S floating SMR demonstration proposal — Announced · China
Recorded link: operator/host field · project record checked 2 Oct 2026 · timeline · permission status · sources - Huakun One floating reactor platform demonstration at the Taipingling site — Siting · China
Recorded link: vendor/developer field · project record checked 6 Oct 2026 · timeline · 1 recorded project action · sources - Huizhou HuaPeng-1 heating demonstration proposal — Siting · China
Recorded link: vendor/developer field · project record checked 13 Oct 2026 · timeline · permission status · sources
Agreements (2)
Agreements, plans, studies and government programs that name this organization as a participant. They are not deployment projects and are not counted above.
- CGN and Tsinghua NHR200-II nuclear district-heating demonstration: NEA-approved preliminary work (2018) — Feasibility or siting study · Status not established · announced Jan 2018
Recorded role: Developer or vendor - Guizhou provincial plan for a CGN small-reactor nuclear demonstration (4 x 100 MW, 13th Five-Year Plan draft) — Government program · Status not established · announced Apr 2016
Recorded role: Developer or vendor
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- No organization-level milestones recorded. See the linked project timelines for dated developments and targets.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
(2)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
- Profile - CGN (company, accessed 6 Nov 2026)