ACR-300

Argentine pressurized-water SMR designed by INVAP, reported at about 300 MWe. Approximate rating from press; basis not stated.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Projects
Announced: ACR-300 SMR proposal at Atucha (Meitner Energy).
Evidence
One source (news report). Record reviewed 2 Oct 2026.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Key facts

Class
SMR
Technology
Pressurized water reactor (PWR)
The attached report says the ACR-300 uses PWR technology but does not describe its primary-circuit layout, so no integral layout is recorded.
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s)
INVAP
Module electrical
300 MWe (gross/net unspecified)
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(1 without a known value)
Module thermal
Not recorded

Tracked deployment projects

Design sources

(1)

Evidence and open questions

(2 notes)
  • Evidence review. Infobae's report of 2 July 2026 says the Argentine government announced a private proposal by Meitner Energy, an Ansari Group company in which INVAP holds 40 percent, to build the ACR-300 at Nucleoeléctrica Argentina's Atucha site. It describes the ACR-300 as a Generation III+ SMR with PWR technology and an approximate output of 300 MWe, based on a design by Argentine engineers, whose execution would be the first commercial first-of-a-kind project of the design worldwide. The plant is for electricity, and the planned five-year build would start only after Economy Ministry approval and licensing by the Autoridad Regulatoria Nuclear (ARN); no regulator review or license is reported. The article ties the design only to the linked Atucha proposal. The approximate 300 MWe (basis unstated) and PWR technology stay supported; the article does not name INVAP as the designer (only as a participant and shareholder of Meitner), and it does not state an integral layout, light-water coolant, neutron spectrum or thermal rating, so the stored light-water and thermal values rest on the PWR label alone. Last checked 19 Oct 2026. Infobae: government announces private project for a new nuclear plant (Meitner Energy, Atucha)
    What would change this

    A Meitner Energy or INVAP design description of the ACR-300, or an ARN licensing filing for the Atucha project, stating the designer, integral layout, thermal rating and gross or net electrical basis. Next scheduled check: 19 Jan 2027.

  • Technology family. The attached report says the ACR-300 uses PWR technology but does not describe its primary-circuit layout, so no integral layout is recorded. Last checked 1 Nov 2026. Infobae: government announces private project for a new nuclear plant (Meitner Energy, Atucha)
    What would change this

    A developer, regulator or IAEA document that states this design's primary-circuit layout. Next scheduled check: 1 Feb 2027.