Designs

AMR

AMR is identified as a microreactor design in the ARIS status report dated 2024-10-17, attributed to STL Nuclear (Pty) Ltd. This dated design identity does not establish current availability, a deployment site, output, or regulatory permission. Technical values remain unknown here pending an independent scope and basis check.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the catalog dated 17 Oct 2024: Pre-conceptual design.
Evidence
4 sources; first primary source: ARIS original status report — AMR (2024-10-17). Record reviewed 8 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Catalog identity snapshot: 17 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
Microreactor
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Spectrum
Thermal
Developer / vendor(s) as of 17 Oct 2024
STL Nuclear (Pty) Ltd
Fuel form
LEU UO2
Development status (as stated)
Pre-conceptual design
Reactor vessel
5.96 m tall, 2.78 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 389.STL Nuclear’s AMR profile. This does not establish an alias with an unattributed Power Cell chart.SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
10 m bar; a person 1.8 m tall
AMR *
5.96 m tall, 2.78 m across
All vessels to scale
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
8 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(4)

Evidence and open questions

(2 notes)
  • Evidence review. The ARIS status report identifies AMR for South Africa and classifies the design status as pre-conceptual design. Later introduction sentences classify it as a high-temperature gas-cooled reactor that uses helium coolant and is graphite moderated. An output figure earlier in that introduction is not quoted and is not proposed. The catalog entry found for this name is a contents line naming STL Nuclear of South Africa, with no power unit. The PCMR page discusses an AMR concept without identifying STL Nuclear or stating a rating, so it is not merged. Stored helium coolant and thermal spectrum stay, and family is proposed as HTGR. Last checked 19 Oct 2026. ARIS original status report — AMR (2024-10-17); Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
    What would change this

    An STL Nuclear specification, outside the ARIS report, that states module output with a unit and the neutron spectrum in those words. Next scheduled check: 19 Jan 2027.

  • Module rating: Not disclosed in the reviewed evidence. The only output figure seen for this design is inside the ARIS report and is not reusable. The catalog line is a contents entry without a power unit. No rating is proposed for this identity profile. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); ARIS original status report — AMR (2024-10-17)
    What would change this

    A non-ARIS STL Nuclear datasheet with AMR module output and a unit. Next scheduled check: 19 Jan 2027.