Reactor vessels to scale
37 reactor vessels, drawn to one scale beside a person. The figures are developers' entries in the IAEA ARIS Small Modular Reactor Technology Catalogue, 2026 edition.
How to read this
- These are figures each developer supplied. The catalog says it is not an official IAEA publication and has not had an official IAEA review. SMRMap has not checked them against drawings or regulators' documents.
- A larger vessel does not mean a more powerful reactor. Designs put different equipment in their vessels; a reactor vessel is not a whole power plant, a containment building or a complete transport module.
- The table identifies inside and flange measurements where stated; most diameter bases are not stated.
- Each shape is a plain rounded cylinder, not the vessel's real shape.
Tallest first within each group. * See the table for a note on this figure.
Integral pressurized water reactor (iPWR)
Pressurized water reactor (PWR)
Boiling water reactor (BWR)
High-temperature gas-cooled reactor (HTGR)
Gas-cooled fast reactor (GFR)
Sodium-cooled fast reactor (SFR)
Lead-cooled fast reactor (LFR)
Molten salt reactor (MSR)
Fluoride-salt-cooled high-temperature reactor (FHR)
Other (see description)
"Other" is SMRMap's own family label.
Figures by design
(37)
| Design | Family | Height (m) | Diameter (m) | Diameter measured | Printed as | Catalog page | Note |
|---|---|---|---|---|---|---|---|
| i-SMR | Integral pressurized water reactor (iPWR) | 30.4 | 5.5 | not stated | 30.4 / 5.5 | p. 43 | Dimensions refer to the reactor-vessel row. A separate containment vessel is described without dimensions. This is not the June 2025 29.7 / 5.5 point. |
| ACP100 (Linglong One) | Integral pressurized water reactor (iPWR) | 10 | 3.35 | not stated | 10 / 3.35 | p. 11 | None |
| ACP100S | Integral pressurized water reactor (iPWR) | 10 | 3.35 | not stated | 10 / 3.35 | p. 135 | None |
| UNITHERM | Integral pressurized water reactor (iPWR) | 9.8 | 2.9 | not stated | 9.8 / 2.9 | p. 487 | None |
| RITM-200M | Integral pressurized water reactor (iPWR) | 8.6 | 3.45 | not stated | 8.6 / 3.45 | p. 159 | None |
| RITM-200N | Integral pressurized water reactor (iPWR) | 7.5 | 3.4 | not stated | 7.5 / 3.4 | p. 71 | None |
| ABV-6E | Integral pressurized water reactor (iPWR) | 6 | 2.4 | not stated | 6 / 2.4 | p. 129 | None |
| ELENA | Integral pressurized water reactor (iPWR) | 3.7 | 1.25 | inside | 3.7 / 1.25 | p. 401 | diameter is internal prose states internal diameter 1250 mm and height 3700 mm wall thickness 132 mm is not the diameter the prose does not swap the cell: height remains 3.7 m and diameter remains 1.25 m The stated diameter is internal; it is not an outside width. |
| CAL-30 | Pressurized water reactor (PWR) | 15 | 4 | not stated | 15m/4m | p. 395 | the printed cell includes the unit m on both numbers |
| AP300 | Pressurized water reactor (PWR) | 11 | 4 | not stated | 11/4 | p. 17 | 330 MWe class versus rated output stays unresolved and is not this cell |
| VBER-300 | Pressurized water reactor (PWR) | 9.3 | 3.9 | not stated | 9.3 / 3.9 | p. 171 | overall height diameter basis not stated verified against section 25: overall height 9.3 m and diameter 3.9 m |
| PWR-20 | Pressurized water reactor (PWR) | 8.9 | 1.8 | not stated | 8.9/1.8 | p. 65 | None |
| Rolls-Royce SMR | Pressurized water reactor (PWR) | 7.82 | 4.2 | not stated | 7.82 / 4.20 | p. 79 | None |
| HAPPY200 | Pressurized water reactor (PWR) | 6 | 2.25 | not stated | 6.0 / 2.25 | p. 37 | None |
| KLT-40S | Pressurized water reactor (PWR) | 4.8 | 2 | not stated | 4.8 / 2.0 | p. 147 | None |
| BWRX-300 | Boiling water reactor (BWR) | 27 | 4 | not stated | 27 / 4 | p. 25 | None |
| GTHTR300 | High-temperature gas-cooled reactor (HTGR) | 23 | 8 | not stated | 23 / 8 | p. 189 | The weight cell's approximation does not qualify these vessel dimensions. |
| Xe-100 | High-temperature gas-cooled reactor (HTGR) | 16.4 | 4.88 | not stated | 16.4 / 4.88 | p. 253 | None |
| HTGR-POLA | High-temperature gas-cooled reactor (HTGR) | 16 | 4.08 | not stated | 16 / 4.08 | p. 205 | belt line is not stated this is not the June 2025 16.2 / 4.08 belt-line point |
| HTMR-100 | High-temperature gas-cooled reactor (HTGR) | 15.7 | 5.6 | flange | 15.7 / 5.6 (flange outer diameter) | p. 211 | flange outer diameter not an unqualified diameter the parenthesis wraps onto the next printed line Diameter is measured at the outer flange. |
| HTTR | High-temperature gas-cooled reactor (HTGR) | 13.2 | 5.5 | not stated | 13.2 / 5.5 | p. 235 | None |
| HTR-10 | High-temperature gas-cooled reactor (HTGR) | 11.1 | 4.2 | not stated | 11.1 / 4.2 | p. 217 | None |
| PeLUIt-40 | High-temperature gas-cooled reactor (HTGR) | 11.1 | 4.2 | inside | 11.1 / 4.2 (inner) | p. 247 | inner not an unqualified diameter The stated diameter is internal; it is not an outside width. |
| AMR | High-temperature gas-cooled reactor (HTGR) | 5.96 | 2.78 | not stated | 5.96 / 2.78 | p. 389 | STL Nuclear’s AMR profile. This does not establish an alias with an unattributed Power Cell chart. |
| Jimmy Fermi heat microreactor | High-temperature gas-cooled reactor (HTGR) | 5 | 5 | not stated | 5/5 | p. 241 | the reactor-vessel subsection says the reactor vessel is 5x5m the pressure-tube sentence gives no size footprint 6000 is not this cell |
| EM2 | Gas-cooled fast reactor (GFR) | 12.5 | 4.6 | not stated | 12.5 / 4.6 | p. 179 | None |
| FMR | Gas-cooled fast reactor (GFR) | 11 | 4.6 | not stated | 11 / 4.6 | p. 183 | a sealed containment vessel is described separately and is not this row |
| Natrium | Sodium-cooled fast reactor (SFR) | 20.4 | 11.6 | not stated | 20.4/11.6 | p. 295 | None |
| BREST-OD-300 | Lead-cooled fast reactor (LFR) | 17.5 | 26 | not stated | 17.5 / 26 | p. 277 | the section calls the vessel metal-concrete; that names this body and does not add a numeric qualifier The section describes a metal-concrete reactor vessel, not a conventional steel cylinder. |
| IMSR (Integral Molten Salt Reactor) | Molten salt reactor (MSR) | 18 | 4.1 | not stated | 18/4.1 | p. 337 | None |
| SSR-W | Molten salt reactor (MSR) | 14 | 7 | not stated | 14 / 7 | p. 363 | None |
| FLEX | Molten salt reactor (MSR) | 7.5 | 6 | not stated | 7.5 / 6 (low pressure) | p. 331 | low pressure not an unqualified diameter |
| Stellarium | Molten salt reactor (MSR) | 7 | 2.3 | not stated | 7 / 2.3 | p. 369 | None |
| Jereh Micro Reactor (JMR) | Molten salt reactor (MSR) | 6.1 | 3.3 | not stated | 6.1 / 3.3 | p. 445 | core diameter 1.85 m and height 2.5 m are a different body |
| KP-FHR commercial plant | Fluoride-salt-cooled high-temperature reactor (FHR) | 7.2 | 3.9 | not stated | 7.2 / 3.9 | p. 349 | 150 MWe stays a two-reactor block and is not one module The electrical output stated for two reactors is not assigned to this one vessel. |
| Energy Well | Fluoride-salt-cooled high-temperature reactor (FHR) | 7 | 3.5 | not stated | 7 / 3.5 | p. 407 | None |
| MARVEL | Other (see description) | 2.55 | 1.22 | not stated | 2.55 / 1.22 | p. 469 | None |
Designs not drawn
38 designs in the catalog are not drawn. Each entry says why.
16 remain held for clarification; 22 are omitted for the reasons below. Neither is drawn.
- CAREM — Held for clarification. SMRMap record: CAREM-25 · Catalog page: p. 31The table and prose give different CAREM25 diameters. No single figure has been selected.
- NuScale Power Module — Held for clarification. SMRMap record: NuScale VOYGR (US460 / NPM) · Catalog page: p. 51The profile qualifies the overall height as approximate and the diameter as internal. An exact comparison point remains held.
- NUWARD — Held for clarification. SMRMap record: NUWARD SMR · Catalog page: p. 59The dimensions and design version remain under review. Figures from the earlier two-reactor concept are not carried forward.
- SAIR — Not drawn. Catalog page: p. 85This catalog entry is not linked to an established matching SMRMap design record, so it is not drawn.
- SMART — Held for clarification. SMRMap record: SMART100 · Catalog page: p. 95SMART and SMART100 identity needs reconciliation before these dimensions can be attributed.
- SMR-300 — Not drawn. SMRMap record: Holtec SMR-300 · Catalog page: p. 103The vessel-dimension row contains no numeric pair.
- STAR — Not drawn. Catalog page: p. 109The cited dimensions describe a reactor module, not a verified reactor vessel.
- WL-100 SMR — Not drawn. Catalog page: p. 115This catalog entry is not linked to an established matching SMRMap design record, so it is not drawn.
- YL-100 — Not drawn. Catalog page: p. 121This catalog entry is not linked to an established matching SMRMap design record, so it is not drawn.
- BANDI — Held for clarification. SMRMap record: BANDI · Catalog page: p. 141The diameter is a range. Its upper end is not presented as one exact diameter.
- MARINA — Not drawn. Catalog page: p. 153No reviewed vessel-dimension pair is available for this comparison.
- SeaMSR-100 — Not drawn. Catalog page: p. 165This catalog entry is not linked to an established matching SMRMap design record, so it is not drawn.
- HECTAR — Held for clarification. SMRMap record: HECTAR · Catalog page: p. 195The dimensions are approximate and marked to be confirmed.
- HTGR — Not drawn. Catalog page: p. 199This catalog entry is not linked to an established matching SMRMap design record, so it is not drawn.
- HTR50S — Not drawn. Catalog page: p. 223The lower parameter cells appear displaced and do not establish a vessel pair.
- HTR-PM — Held for clarification. SMRMap record: HTR-PM · Catalog page: p. 229Inside-diameter and reactor-module scope remain under review; no whole-plant dimension is inferred.
- ARC-100 — Held for clarification. SMRMap record: ARC-100 · Catalog page: p. 259The section describes reactor-shell and guard-vessel boundaries differently. A single comparison body is not established.
- AURORA — Not drawn. Catalog page: p. 265The profile describes a product line and gives no vessel-dimension pair for a single matched design.
- Blue Capsule — Held for clarification. SMRMap record: Blue Capsule · Catalog page: p. 269The vessel-dimension cell is blank. An older measurement is not substituted.
- HEXANA — Held for clarification. SMRMap record: HEXANA · Catalog page: p. 283The parameter-table labels and measurements appear misaligned; no exact vessel pair is selected.
- LFR-AS-200 — Held for clarification. SMRMap record: LFR-AS-200 · Catalog page: p. 289The row contains footprint wording and displaced measurements. Those are not treated as a vessel height and diameter.
- OTRERA-300 — Held for clarification. SMRMap record: OTRERA 300 · Catalog page: p. 301The dimensions are upper bounds, not exact height and diameter measurements.
- SALUS 100 — Held for clarification. SMRMap record: SALUS-100 · Catalog page: p. 311The prose qualifies the vessel dimensions as approximate; no exact point has been selected.
- SEALER 55 — Held for clarification. SMRMap record: SEALER · Catalog page: p. 319The cylindrical-section height and the table height require a consistent physical boundary.
- CA Waste Burner — Not drawn. Catalog page: p. 325The container/module wording does not establish one standing reactor vessel.
- JFHR — Not drawn. Catalog page: p. 343The table alignment does not establish a verified height/diameter pair.
- LFTR — Held for clarification. Catalog page: p. 357Approximate dimensions for two products are not combined into one vessel.
- ThorCon — Not drawn. Catalog page: p. 375The Can contains a reactor vessel; its dimensions are not automatically that vessel’s dimensions.
- Thorizon — Not drawn. Catalog page: p. 381No fixed large reactor-pressure-vessel dimensions are given.
- eVinci — Not drawn. Catalog page: p. 413The vessel row is not applicable; a shipping container is not a reactor vessel.
- HARPIA — Not drawn. Catalog page: p. 419No reviewed vessel-dimension pair is available for this comparison.
- HOLOS-MONO — Not drawn. Catalog page: p. 427The recorded dimensions describe a sealed power module containing more than one pressure vessel.
- HOLOS-QUAD — Not drawn. Catalog page: p. 435The recorded dimensions describe coupled sealed power modules, not one reactor vessel.
- Kronos MMR — Not drawn. Catalog page: p. 451The relation to older similarly described reactor designs remains unresolved.
- Loki MMR — Not drawn. Catalog page: p. 461The relation to older similarly described reactor designs remains unresolved.
- MoveLux — Held for clarification. SMRMap record: MoveluX · Catalog page: p. 475The printed dimensions require clarification before an exact pair can be selected.
- SHELF-M — Not drawn. Catalog page: p. 481The table alignment and capsule wording do not establish a verified reactor-vessel pair.
- Zeus — Not drawn. Catalog page: p. 493Container, service-life and active-region figures do not establish a matched reactor vessel.
Source and credit
Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026). Checked against the 2026 edition, printed September 2026, on 2 November 2026.
Figures are from one edition and may change in a later one.
The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license.
These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
Drawing: SMRMap. Figures: developers' entries in the IAEA ARIS Small Modular Reactor Technology Catalogue, 2026 edition.