G4M
G4M, the Gen4 Module, is Gen4 Energy's lead-bismuth-cooled fast reactor concept with uranium nitride fuel, formerly called the Hyperion Power Module. In 2012 the company described it as a 25 MWe (70 MWt) unit; that output is recorded on the 2012 Savannah River project, not on this profile.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- No live project recorded here; 1 earlier-plan record (Hyperion / Gen4 Module proposal at Savannah River Site). Development status as stated in the catalog dated 1 Jun 2024: Conceptual design.
- Evidence
- 3 sources; first primary source: ARIS original status report — G4M (2024-06-01). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Catalog identity snapshot: 1 Jun 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead bismuth
- Spectrum
- Fast
- Developer / vendor(s) as of 1 Jun 2024
- Gen4 Energy Inc.
- Fuel form
- Uranium nitride
- Development status (as stated)
- Conceptual design
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Hyperion / Gen4 Module proposal at Savannah River Site (2012) — Announced · United States
Design sources
(3)
- ARIS original status report — G4M (2024-06-01) (IAEA/NEA, accessed 2 Oct 2026)
- Gen4 Energy (formerly Hyperion): plans to deploy an advanced reactor at Savannah River (company, accessed 2 Oct 2026)
- Gen4 Energy: Technology (Gen4 Module), Wayback Machine capture of 9 April 2012 (company, accessed 19 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The ARIS status report for G4M (United States) identifies the Gen4 Module (G4M) as the design Gen4 Energy, founded in 2007 as Hyperion Power Generation, was formed to develop, and classifies it at conceptual design status; the downloaded report shows a published date of 'prior to June 2021'. Gen4 Energy's own technology page (archived 9 April 2012) describes the Gen4 Module as a liquid-metal-cooled, uranium-nitride-fueled, fast-spectrum reactor with lead-bismuth eutectic coolant, designed to deliver 70 MW of heat (25 MW of electricity) for a 10-year life without refueling, for remote and off-grid power. Gen4 Energy's release of 5 March 2012 announces the commitment of Hyperion Power Generation, DOE-Savannah River and SRNL to deploy a privately funded first-of-a-kind Hyperion reactor at the Savannah River Site, with NRC licensing still to come, and describes the same module under its earlier name, the Hyperion Power Module, at 25 MW electric. These sources connect the design to the linked 2012 Savannah River proposal; nothing opened shows later development, licensing or availability. Stored vendor, LFR family, lead-bismuth coolant, fast spectrum and uranium nitride fuel stay supported, and the module rating stays empty: the developer's 2012 page gives 70 MWth and 25 MWe, basis unstated, as a dated 2012 design intent, and that output is recorded on the 2012 project. Last checked 19 Oct 2026. ARIS original status report — G4M (2024-06-01); Gen4 Energy: Technology (Gen4 Module), Wayback Machine capture of 9 April 2012; Gen4 Energy (formerly Hyperion): plans to deploy an advanced reactor at Savannah River
What would change this
Any post-2012 Gen4 Energy filing (for example an NRC pre-application or a published IAEA booklet edition entry for G4M) that would show whether the design is still being developed and confirm or revise the 70 MWth / 25 MWe design intent. Next scheduled check: 19 Jan 2027.
- Module rating. Gen4 Energy's 2012 technology page gives 70 MW of heat and 25 MW of electricity for the Gen4 Module. The record's existing decision keeps that 2012 output on the 2012 Savannah River project, and this dated catalog identity profile carries no rating by the project's standing rule, so no module rating is stored here. Last checked 19 Oct 2026. Gen4 Energy: Technology (Gen4 Module), Wayback Machine capture of 9 April 2012; ARIS original status report — G4M (2024-06-01)
What would change this
A later Gen4 Energy technical document or published IAEA booklet edition giving the G4M rating with a gross or net basis, which would replace the 2012 design intent. Next scheduled check: 19 Jan 2027.