GT-MHR
GT-MHR, the gas turbine modular helium reactor, is JSC Afrikantov OKBM's helium-cooled, graphite-moderated reactor, designed to produce electricity through a Brayton cycle. The 2024 catalog lists its preliminary design as completed.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated in the catalog dated 17 Oct 2024: Preliminary design completed; key technologies are being demonstrated.
- Evidence
- 2 sources; first primary source: ARIS original status report — GT-MHR (2024-10-17). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 17 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s) as of 17 Oct 2024
- Afrikantov OKBM
- Fuel form
- UO2 or PuO2
- Development status (as stated)
- Preliminary design completed; key technologies are being demonstrated
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- ARIS original status report — GT-MHR (2024-10-17) (IAEA/NEA, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The ARIS report identifies GT-MHR for the Russian Federation and classifies design status as preliminary design. Its introduction says GT-MHR couples an HTGR with a Brayton cycle to produce electricity. The catalog section header names JSC Afrikantov OKBM. A summary numeral beside the name has no unit in that fragment and is not adopted. Stored status text is longer than the ARIS status line and is not replaced. This identity profile does not receive a module rating. ARIS parameters are not copied. Last checked 19 Oct 2026. ARIS original status report — GT-MHR (2024-10-17); Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
An OKBM specification, outside ARIS, that states GT-MHR module electrical and thermal output with a basis. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The ARIS report is restricted to identity and classification here. The catalog summary numeral is unlabeled and is not proposed. This identity profile would not store a module rating in any case. Last checked 19 Oct 2026. ARIS original status report — GT-MHR (2024-10-17); Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A non-ARIS OKBM datasheet with GT-MHR MWe or MWth. Next scheduled check: 19 Jan 2027.