PeLUIt-40

PeLUIt-40 is an Indonesian high-temperature gas-cooled reactor for cogeneration of electricity and industrial heat, attributed to BRIN and the Bandung Institute of Technology. The 2024 catalog's summary table lists conceptual design; its ARIS report lists basic design.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the catalog dated 18 Oct 2024: Basic design in progress.
Evidence
2 sources; first primary source: ARIS original status report — PeLUIt-40 (2024-10-18). Record reviewed 2 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Catalog identity snapshot: 18 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Spectrum
Thermal
Developer / vendor(s) as of 18 Oct 2024
National Research and Innovation Agency (BRIN) & Bandung Institute of Technology (ITB)
Fuel form
UO2
Development status (as stated)
Basic design in progress
Reactor vessel
11.1 m tall, 4.2 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 247.inner not an unqualified diameter The stated diameter is internal; it is not an outside width.SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
10 m bar; a person 1.8 m tall
PeLUIt-40 *
11.1 m tall, 4.2 m across
All vessels to scale
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(2)

Evidence and open questions

(2 notes)