Designs

PRISM

PRISM (Power Reactor Innovative Small Module) is identified on GE Vernova Hitachi Nuclear Energy's sodium-fast-reactor page as a pool-type liquid-metal-fueled small modular SFR concept. This dated design identity does not establish current availability, a deployment site, output, or regulatory permission. Marketing-page capacity figures are not copied here because the opened page uses inconsistent thermal-unit labeling and the technical PDF URL redirected.

Reactor type
Sodium-cooled fast reactor. How it works, with a 3D view.
Projects
No live project recorded here; 1 canceled (GE Hitachi PRISM plutonium-reuse proposal at Sellafield). Development status as stated in the source dated 2 Oct 2026: Detailed design.
Evidence
2 sources; first primary source: GE Vernova Nuclear — Sodium fast reactors / PRISM concept page. Record reviewed 2 Oct 2026.
Schematic of Natrium, this type's example. On the left, a wide reactor vessel inside a guard vessel holds the core low down, with control rods from above, an upper structure, one heat exchanger and one pump.
Schematic of Natrium, this type's example.

Catalog identity snapshot: 2 Oct 2026 (designer publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Sodium-cooled fast reactor (SFR)
Coolant
Sodium
Spectrum
Fast
Developer / vendor(s) as of 2 Oct 2026
GE Vernova Hitachi Nuclear Energy
Fuel form
U-Pu-Zr
Development status (as stated)
Detailed design
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(2)

Evidence and open questions

(2 notes)
  • Evidence review. GE Vernova Hitachi Nuclear Energy's undated sodium fast reactor page describes the Power Reactor Innovative Small Module (PRISM) as its concept for a pool-type, liquid-metal-fueled small modular SFR that uses metallic fuel in a bath of liquid sodium at atmospheric pressure, with natural circulation removing heat. The page gives the PRISM reactor an electrical output of 311 MWe, but labels its rated thermal power as '840 MWe', so the thermal figure's unit is internally inconsistent. GVH says the PRISM concept is being put into practice in two other reactors, Natrium in Wyoming and ARC-100 in Canada; those are separate designs, and the page names no PRISM project of its own. The ARIS report (published before June 2021) classifies PRISM as a fast-spectrum design at detailed-design status. No opened source names the linked Sellafield plutonium-reuse proposal or gives a dated licensing status. Stored vendor, SFR family, sodium coolant and fast spectrum stay supported; the developer's 311 MWe (basis unstated) can fill the empty electrical rating, while the mislabeled thermal figure should stay unassigned. Last checked 19 Oct 2026. GE Vernova Nuclear — Sodium fast reactors / PRISM concept page; IAEA ARIS design record: PRISM
    What would change this

    A GVH PRISM technical datasheet with a correctly labeled thermal rating and gross/net basis, or a published IAEA booklet/catalogue edition entry for PRISM. Next scheduled check: 19 Jan 2027.

  • Module rating. GE Vernova Hitachi's sodium-fast-reactor page gives an electrical output of 311 MWe for PRISM, but the same sentence labels the thermal rating in MWe. This record is one of the dated catalog identity profiles that, by the project's standing rule and its regression test, carry no rating until a current technical primary for the same version is reviewed; the figure is therefore not stored. Last checked 19 Oct 2026. GE Vernova Nuclear — Sodium fast reactors / PRISM concept page
    What would change this

    A GVH technical document or published IAEA booklet edition giving PRISM's thermal rating in MWth and the basis of 311 MWe, which would allow the thermal field to be filled and the basis qualified. Next scheduled check: 19 Jan 2027.