Projects / United Kingdom · Canceled

GE Hitachi PRISM plutonium-reuse proposal at Sellafield (not taken forward)

On 1 December 2011 World Nuclear News reported that GE Hitachi suggested a plant of two 311 MWe PRISM units at Sellafield.

Current status

Stage
Canceled
How current
General record check . Bounded evidence review . None of the 4 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Sodium-cooled fast reactor. How it works, with a 3D view.
Schematic of Natrium, this type's example. On the left, a wide reactor vessel inside a guard vessel holds the core low down, with control rods from above, an upper structure, one heat exchanger and one pump.
Schematic of Natrium, this type's example.

Description

That attributed per-unit figure is stored, and the article does not say gross or net. The same article states two units, and that count is stored. GE Hitachi's 4 April 2012 release says the reactor would disposition UK plutonium while generating 600 megawatts of electricity. It does not say whether 600 megawatts is per module or for the plant, or gross or net, so that later statement is not stored as a plant total and does not replace the earlier unit rating. The 2012 release does not state a different module count. The proposal was a vendor offer, never a licensed project. On 24 January 2025 the UK Government chose to immobilise the stockpile for disposal, so this reuse route was not taken forward. No construction occurred.

Key facts

Design
PRISM (SMR)
Technology
Sodium-cooled fast reactor (SFR) · sodium
Operator(s)
Not recorded
Vendor for linked design
GE Vernova Hitachi Nuclear Energy
Design origin
United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Sellafield (proposed PRISM location) · United Kingdom · precision: site area (named plant, laboratory, base, port, campus or parcel)
Coordinates of the named Sellafield (Hitachi) proposal location from the NuclearChain reactors export (CC BY 4.0), whose unit points derive from GEM's Global Nuclear Power Tracker. Site-area point for a proposal that was never built; not a surveyed plot.
Coordinates
54.4224, -3.4868 · site-area point (approximate)
Electrical capacity
311 MWe (gross/net unspecified) · scope: module
The 1 December 2011 article attributes 311 MWe to each of two units.
Thermal capacity
Not recorded
Modules planned
2
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

GE Hitachi PRISM plutonium-reuse proposal at Sellafield (not taken forward) is recorded at Sellafield (proposed PRISM location), England, United Kingdom. Operator: No operator is recorded. Recorded vendor: GE Vernova Hitachi Nuclear Energy. Stage: Canceled. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'sellafield-hitachi-nuclear-power-plant-1' (54.4224, -3.4868)

Recorded electrical output is 311 MWe (gross/net unspecified), scope module. The 1 December 2011 article attributes 311 MWe to each of two units. Modules planned: 2. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Contractor

Source-backed project statement GE Hitachi's 4 April 2012 release says it signed a memorandum of understanding with the National Nuclear Laboratory, under which the laboratory would provide expert technical input to a potential UK PRISM deployment to disposition plutonium. That was preparatory technical support, not a construction contract or license, and the UK's January 2025 choice of immobilisation meant the proposal was not taken forward. GE Hitachi and National Nuclear Laboratory MOU on the UK plutonium stockpile; WNN: UK opts for disposal of plutonium inventory

Fuel
  • Fuel form stated for PRISM (catalog profile as of 2 Oct 2026)U-Pu-Zr
No project-specific fuel supply arrangement is recorded as a structured fact.

World Nuclear News of 1 December 2011 says the proposed PRISM units would irradiate fuel made from Sellafield's stored plutonium mixed with depleted uranium, and GE Hitachi's 2012 release says PRISM would use practically all of it. No fabrication contract or allocation was made, and on 24 January 2025 the government chose to immobilise the stockpile, so that fuel route was not taken forward. WNN: Prism proposed for UK plutonium disposal; GE Hitachi and National Nuclear Laboratory MOU on the UK plutonium stockpile; WNN: UK opts for disposal of plutonium inventory

Not found in the sources we checked (3): Customer or offtaker; Funding and government decisions; Comparable schedule revision
Customer or offtaker

World Nuclear News of 1 December 2011 and GE Hitachi's 4 April 2012 release describe a PRISM plant to disposition UK plutonium while generating electricity, but name no buyer of that electricity. The overseas customers mentioned own part of the plutonium stockpile, not offtake, and the UK chose immobilisation instead in January 2025. WNN: Prism proposed for UK plutonium disposal

Funding and government decisions

World Nuclear News of 1 December 2011 says GE Hitachi expected the plant to cost about as much as a large conventional reactor, and its 4 April 2012 release calls it a multibillion-pound investment, but neither names a funder or amount. The investment in the 2025 notices is for the separate immobilisation plant. WNN: Prism proposed for UK plutonium disposal; GE Hitachi and National Nuclear Laboratory MOU on the UK plutonium stockpile

Comparable schedule revision

Comparable schedule revision not established. World Nuclear News of 1 December 2011 gives durations, irradiating the stockpile within five years and up to 60 years of operation, and GE Hitachi's 2012 release gives no construction date. The 24 January 2025 notices select immobilisation. No dated PRISM construction or operation target exists in these sources, so no revision is shown. WNN: Prism proposed for UK plutonium disposal; WNN: UK opts for disposal of plutonium inventory; NDA group welcomes Government decision on plutonium disposition

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(7 notes)
  • Evidence review. World Nuclear News reported on 1 December 2011 that GE-Hitachi Nuclear Energy had proposed two Prism fast reactors at Sellafield, and it attributed 311 MWe to each unit. That per-unit figure and the count of two are already stored. The article does not say gross or net, and it says the plant could operate for up to 60 years, which is a ceiling. GE Hitachi's 4 April 2012 release says an MOU with the National Nuclear Laboratory covers technical input to a possible PRISM deployment that would generate 600 megawatts. That sentence does not say whether 600 megawatts is per module or for the plant, or gross or net, so it is not stored and does not replace 311 MWe. On 24 January 2025 the NDA welcomed a UK government decision to immobilise the civil plutonium inventory. The same notice says the next phase is a processing plant and interim storage at Sellafield. That plant is a different facility. The 2025 World Nuclear News article says the NDA analysis compared immobilisation and reuse and recommended immobilisation. Neither 2025 text names PRISM as the chosen plant. No construction or operating license for this proposal is in these texts. Last checked 20 Oct 2026. WNN: Prism proposed for UK plutonium disposal; GE Hitachi and National Nuclear Laboratory MOU on the UK plutonium stockpile; NDA group welcomes Government decision on plutonium disposition; WNN: UK opts for disposal of plutonium inventory
    What would change this

    A UK government or NDA document that names PRISM as a selected Sellafield plant, or that states a license decision for this proposal. Next scheduled check: 20 Jan 2027.

  • Plant capacity (scope qualified). The 1 December 2011 article attributes 311 MWe to each of two units. That per-unit figure is stored with the nameplate basis unspecified. The 4 April 2012 company release states 600 megawatts without saying per module or plant, or gross or net. The later statement does not replace the earlier attributed unit rating and is not stored as the plant total. Last checked 19 Oct 2026. WNN: Prism proposed for UK plutonium disposal; GE Hitachi and National Nuclear Laboratory MOU on the UK plutonium stockpile
    What would change this

    A GE Hitachi or UK government document states whether the 4 April 2012 figure of 600 megawatts is per module or for the plant, and whether it is gross or net. Next scheduled check: 19 Jan 2027.

  • Module/unit count. The 1 December 2011 article states two PRISM units. The company release does not state a different count. Last checked 19 Oct 2026. WNN: Prism proposed for UK plutonium disposal
    What would change this

    A GE Hitachi or UK government document states a different module count for this proposal. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites: Not applicable. The UK Government decided on 24 January 2025 to immobilise the civil separated plutonium at Sellafield for disposal, which the NDA group welcomed, so the PRISM reuse proposal was not taken forward and has no pending decision. The next step the NDA describes concerns the immobilisation program, not PRISM. Last checked 23 Oct 2026. NDA group welcomes Government decision on plutonium disposition
    What would change this

    A reversal of the January 2025 plutonium immobilisation decision. Next scheduled check: 23 Oct 2027.

  • Permissions and public process. World Nuclear News reported in December 2011 that GE Hitachi suggested a two-unit PRISM plant at Sellafield to the UK government while the government was consulting on how to manage its stockpile. The proposal was a vendor offer within that policy consultation; no site license, planning application or other permission for a PRISM plant is shown in the sources reviewed. Last checked 23 Oct 2026. WNN: Prism proposed for UK plutonium disposal
    What would change this

    None expected: the UK chose immobilisation in January 2025; a reversal of that policy would reopen the question. Next scheduled check: 23 Oct 2027.

  • Site dependencies (land, grid, water). The 2011 proposal placed the two PRISM units at Sellafield, where the plutonium stockpile is stored, to irradiate fuel made from it on site. No land, grid or cooling arrangement was agreed, and the UK's January 2025 decision to immobilise the plutonium at Sellafield ended this reuse route. Last checked 23 Oct 2026. WNN: Prism proposed for UK plutonium disposal; NDA group welcomes Government decision on plutonium disposition
    What would change this

    None expected after the January 2025 immobilisation decision. Next scheduled check: 23 Oct 2027.

  • Spent fuel, waste and closure. GE Hitachi's 2011 proposal said irradiated PRISM fuel would be stored in air-cooled silos and later disposed of with other high-level waste, but no plant was built, so no plant waste or decommissioning liability arose. Under the UK's January 2025 decision, the NDA group will instead immobilise the civil plutonium at Sellafield for final disposal in a geological disposal facility. Last checked 23 Oct 2026. WNN: Prism proposed for UK plutonium disposal; NDA group welcomes Government decision on plutonium disposition
    What would change this

    A change in UK plutonium policy, or the NDA program approval for immobilisation. Next scheduled check: 23 Oct 2027.

Evidence dates

(0 of 4 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.4 of 4 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(4)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: GE Hitachi PRISM plutonium-reuse proposal at Sellafield (not taken forward) — https://smrmap.com/projects/sellafield-prism-proposal/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “GE Hitachi PRISM plutonium-reuse proposal at Sellafield (not taken forward)”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/sellafield-prism-proposal/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.