Designs / dsn-atgor
ATGOR
Rosatom's 2 May 2019 house publication identifies NIKIET's ATGOR as a transportable modular nuclear-station concept with a gas-cooled reactor. It describes a 1.2 MW station and equipment transport on two road platforms. A module electrical or thermal nameplate is not assigned from that station figure. This is historical design evidence, not current availability, a deployment commitment or a regulatory permission.
- Class
- SMR
- Technology
- Other
- Coolant
- unknown
- Spectrum
- unknown
- Developer / vendor(s)
- NIKIET
- Inclusion basis
- smr_by_vendor_claim_with_capacity_check
- Confidence
- medium
- Last verified
- 2026-10-08
Tracked deployment projects
- No projects tracked here.
Design sources
- Rosatom: transportable modular ATGOR concept (2 May 2019) (company_primary, accessed 2026-10-08)