NIKIET
The ARIS status report dated 2025-07-01 identifies NIKIET as the designer of SHELF-M. This is a dated attribution; current corporate status and ownership have not been verified.
- Projects
- Siting: Shelf-M small nuclear plant at the Sovinoe deposit, Chukotka. 9 designs.
- Evidence
- 2 sources; first primary source: ARIS original status report — SHELF-M (2025-07-01). Record reviewed 2 Oct 2026.
Key facts · Designs · Tracked projects · Agreements · Ownership · Milestones · Sources · Its projects in the table · Who is involved
Key facts
- Organization type
- Research, Reactor developer
- Category
- research institution
- Country
- Russia
- Confidence
- medium
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current activity)
All fields
(5 without a known value)
- Aliases
- None recorded in this release
- Listing status
- Unknown (no listing is recorded here; this does not mean the organization is private)
- Exchange / ticker
- None recorded in this release
- Ownership / control
- Unknown (no owner or controller is recorded here)
- Website
- None recorded in this release
Linked designs
(9)
- BREST-OD-300 — Lead-cooled fast reactor (LFR) · SMR
- SHELF-M — Integral pressurized water reactor (iPWR) · SMR
- UNITHERM — Integral pressurized water reactor (iPWR) · Microreactor
- KARAT-45 — Boiling water reactor (BWR) · SMR
- KARAT-100 — Boiling water reactor (BWR) · SMR
- VK-300 — Boiling water reactor (BWR) · SMR
- RUTA-70 — Other · SMR
- ATGOR — Other · SMR
- GREM — Other · SMR
Tracked deployment projects
1 linked project record: 1 siting, counting every project that names this organization in any recorded role (vendor, operator or participant); the developer table counts only projects that use its designs. These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- Shelf-M small nuclear plant at the Sovinoe deposit, Chukotka — Siting · Russia
Recorded link: vendor/developer field · project record checked 6 Oct 2026 · timeline · permission status · sources
Agreements (2)
Agreements, plans, studies and government programs that name this organization as a participant. They are not deployment projects and are not counted above.
- Rosatom list of prospective Arctic sites for SHELF-M microreactor plants (Yakutia, Krasnoyarsk, Chukotka) — Feasibility or siting study · Status not established · announced Aug 2023
Recorded role: Developer or vendor - Feasibility study for a four-unit VK-300 nuclear cogeneration plant in the Arkhangelsk region — Feasibility or siting study · Completed · announced Apr 2007
Recorded role: Developer or vendor
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- No organization-level milestones recorded. See the linked project timelines for dated developments and targets.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
(2)
- ARIS original status report — SHELF-M (2025-07-01) (IAEA/NEA, accessed 2 Oct 2026)
- ARIS original status report — UNITHERM (2024-10-16) (IAEA/NEA, accessed 2 Oct 2026)