Designs / dsn-balder

BALDER experimental configuration

Experimental configuration of Copenhagen Atomics technology planned at PSI. ENSI explicitly describes a container-form SMR test concept, and the NEA design inventory lists BALDER separately from CAWB. PSI’s later FAQ says the earlier approximately 1 MWth/30-day reference case is being developed into a staged programme; its final scope is not settled. No fixed nameplate or commercial CAWB rating is assigned. PSI is the intended operator; the developer supplies components and funding.

Class
SMR
Technology
Molten salt reactor (MSR)
Coolant
molten salt
Spectrum
unknown
Developer / vendor(s)
Copenhagen Atomics
Module electrical
—
Module thermal
—
Inclusion basis
smr_by_design_class
Confidence
medium
Last verified
2026-10-13

Tracked deployment projects

Design sources