Copenhagen Atomics critical experiment at the Paul Scherrer Institute

BALDER is a planned experimental critical reactor at PSI, not a commercial power plant.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . None of the 4 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
Planned step: 2028 (target). BALDER: first tests no earlier than 2028. This is not an achieved milestone. Source: PSI: questions and answers on BALDER.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • The mapped point is not an exact surveyed coordinate.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Description

PSI is the intended operator; Copenhagen Atomics supplies components and funding. ENSI describes preparation of an application requiring construction and operating licenses and separate releases. PSI’s FAQ, re-read 10 November 2026, gives its Q3 2026 planning: application submission by the end of the first quarter of 2027 (its earlier Q2 2026 planning said the end of 2026) and first tests no earlier than 2028. Its earlier approximately 1 MWth, 30-day experiment is a reference case; the final staged scope remains under definition. No filed application, license or physical construction start is established by these sources. PSI’s July 2024 release targeted a critical experiment in 2026. The FAQ acknowledges a program delay, but its first-tests date is not a revised first-criticality date.

Key facts

Design
BALDER experimental configuration (SMR)
Technology
Molten salt reactor (MSR) · molten salt
Intended operator(s)
Paul Scherrer Institute
Vendor for linked design
Copenhagen Atomics
Design origin
Denmark: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Paul Scherrer Institute, Villigen · Switzerland · precision: site area (named plant, laboratory, base, port, campus or parcel)
OpenStreetMap Nominatim point for 'Paul Scherrer Institut, Villigen' (research institute); campus point, not an experiment hall.
Coordinates
47.5359, 8.2222 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
13 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Copenhagen Atomics critical experiment at the Paul Scherrer Institute is recorded at Paul Scherrer Institute, Villigen, Aargau, Switzerland. Intended operator: Paul Scherrer Institute. Recorded vendor: Copenhagen Atomics. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: 'Paul Scherrer Institut, Villigen' (research institute)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Operator or intended licensed owner
Reactor supplier
Funding and government decisions

Source-backed project statement PSI's BALDER FAQ says the costs of approval, construction, commissioning and implementation of the reactor experiment will be borne in full by Copenhagen Atomics and that no Swiss taxpayer money will be used. PSI says it cannot give the total cost. This is full funding by the vendor with no amount disclosed. PSI: questions and answers on BALDER

Site host or owner
Programs and agreements naming the project
Not found in the sources we checked (4): Customer or offtaker; Contractor; Fuel; Comparable schedule revision
Customer or offtaker

PSI's BALDER FAQ says PSI is not building a nuclear power plant, since new plants are prohibited in Switzerland, and its 1 July 2024 release describes a critical experiment to validate Copenhagen Atomics' technology. Neither names a user or buyer of heat or power from the experiment. PSI: questions and answers on BALDER; PSI: cooperation in reactor research (Copenhagen Atomics)

Contractor

PSI's 1 July 2024 release describes a four-year collaboration agreement with Copenhagen Atomics, PSI's FAQ says Copenhagen Atomics contributes pumps, components and high-purity salts while PSI builds an additional building, and ENSI says PSI is preparing the application with Copenhagen Atomics. PSI is the intended operator and Copenhagen Atomics the vendor, so these are not contractor appointments. No other engineering or construction firm is named. PSI: cooperation in reactor research (Copenhagen Atomics); PSI: questions and answers on BALDER; ENSI: Projekt BALDER (page modified 15 June 2026)

Fuel
No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.

PSI's BALDER FAQ says this reactor type uses molten salt with uranium fluoride fuel, and PSI's 1 July 2024 release describes Copenhagen Atomics' salt production. These are design and company-capability statements. Neither names a fuel quantity, allocation or delivery for the PSI experiment. PSI: questions and answers on BALDER; PSI: cooperation in reactor research (Copenhagen Atomics)

Comparable schedule revision

Comparable schedule revision not established. PSI’s 1 July 2024 release targeted a critical experiment in 2026. Its FAQ statement labeled Q2 2026 acknowledges delay to tests originally planned for 2026 and expects first tests no earlier than 2028. The program distinguishes cold tests, hot tests and criticality. This supports a program delay but does not establish a revised first-criticality date or an exact two-year slip. PSI: cooperation in reactor research (Copenhagen Atomics); PSI: questions and answers on BALDER; ENSI: Projekt BALDER (page modified 15 June 2026)

Not recorded in SMRMap's reviewed evidence (1): Project proposer or applicant
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.

Timeline

Targets

Planned, target and estimated dates are not achievements or commitments.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes)
  • Evidence review. PSI and Copenhagen Atomics plan BALDER, a time-limited test of a container-sized Copenhagen Atomics molten-salt reactor experiment in a new nuclear test facility on PSI's site at Villigen, Switzerland; it is a research experiment, not a power plant. ENSI's German-language project page says PSI intends to operate the facility for test purposes for one month at a reduced power of one megawatt thermal, while PSI's FAQ calls an approximately 1 MW thermal, 30-day case an earlier reference case. PSI states the roles: PSI is responsible for licensing and safety and is named the operator, while Copenhagen Atomics finances the project and supplies the experiment's components; the collaboration agreement was announced on 1 July 2024. No application has been filed: ENSI says PSI intends to submit the application documents at the earliest in the second half of 2026, and PSI's Q2 2026 planning targets submission by the end of 2026, with first tests no earlier than 2028. As a low-hazard installation it needs no general license but needs construction and operating licenses from DETEC (PSI's FAQ describes a combined construction and operating license) and a series of ENSI technical releases. The stored BALDER design, PSI as operator, Copenhagen Atomics as vendor, unstored ratings and the siting stage stay. The next documentary decision is the filing of the license application with the Swiss Federal Office of Energy. Last checked 19 Oct 2026. ENSI: Projekt BALDER (page modified 15 June 2026); PSI: questions and answers on BALDER; PSI: cooperation in reactor research (Copenhagen Atomics)
    What would change this

    PSI's license application to the Federal Office of Energy (with its safety report), or an ENSI or DETEC notice that it has been filed, would change this record. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. PSI's FAQ, in a statement dated Q2 2026, says PSI plans to submit the application for the nuclear test facility by the end of 2026 and expects first tests no earlier than 2028, after an originally planned 2026 test slipped. The next steps it lists are filing a combined construction and operating license application and its grant, then building and commissioning the facility. The licensing duration is not yet estimated. Last checked 23 Oct 2026. PSI: questions and answers on BALDER
    What would change this

    PSI's submission of the combined license application, or a revised PSI schedule. Next scheduled check: 23 Jan 2027.

  • Permissions and public process. ENSI's BALDER page (modified June 2026) says PSI intends to apply for a nuclear installation with low hazard potential, which needs no general license but a construction and an operating license from the federal environment and energy department (DETEC) plus a series of ENSI technical releases, filed through the Swiss Federal Office of Energy. PSI's FAQ says no formal public participation is required, though objections can be raised before a permit is granted, and PSI will run information events. No application had been filed in these sources. Last checked 23 Oct 2026. ENSI: Projekt BALDER (page modified 15 June 2026); PSI: questions and answers on BALDER
    What would change this

    PSI's filing of the BALDER license application with the Federal Office of Energy, or a published objection period. Next scheduled check: 23 Jan 2027.

  • Site dependencies (land, grid, water). PSI's FAQ says PSI is constructing an additional building, a nuclear test facility, on its Villigen premises for the Copenhagen Atomics experiment, and that site evaluations within the PSI premises have been carried out. The experiment container will be delivered only after permits are granted and the facility is built. These sources give no exact plot and do not describe grid, cooling or other utility arrangements for the test facility. Last checked 23 Oct 2026. PSI: questions and answers on BALDER
    What would change this

    PSI's license application or a published site plan for the BALDER nuclear test facility. Next scheduled check: 23 Jan 2027.

  • Spent fuel, waste and closure. PSI's FAQ says that once the tests are complete the experiment will be returned to Copenhagen Atomics and leave Switzerland, and lists dismantling of the experiment and its removal from Switzerland as the final project milestones. This is the partners' stated plan; the FAQ does not say how the irradiated fuel salt will be packaged, where it will go or who pays for its disposal. Last checked 23 Oct 2026. PSI: questions and answers on BALDER
    What would change this

    PSI's license application or safety report describing the handling and export of the irradiated experiment and fuel salt. Next scheduled check: 23 Jan 2027.

Evidence dates

(0 of 4 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.4 of 4 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(4)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Copenhagen Atomics critical experiment at the Paul Scherrer Institute — https://smrmap.com/projects/psi-copenhagen-atomics/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Copenhagen Atomics critical experiment at the Paul Scherrer Institute”. Record reviewed 13 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/psi-copenhagen-atomics/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.