BARC high-temperature gas-cooled hydrogen reactor
High-temperature gas-cooled reactor of up to 5 MWth that the Bhabha Atomic Research Centre is designing and developing as a demonstration heat source for hydrogen production. It is to be coupled with a thermochemical cycle such as copper-chlorine. The sources read do not name the coolant gas.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- Siting: BARC Visakhapatnam HTGCR hydrogen demonstration proposal.
- Evidence
- 3 sources; first primary source: DAE parliamentary answer naming lead sites. Record reviewed 1 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Developer / vendor(s)
- Bhabha Atomic Research Centre
- Module electrical
- thermal only (no MWe)
- Module thermal
- up to 5 MWth (nameplate; basis unspecified)
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Coolant (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 1 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Coolant
- Not recorded
- Spectrum
- Not recorded
Tracked deployment projects
- BARC Visakhapatnam HTGCR hydrogen demonstration proposal — Siting · India
Design sources
(3)
- DAE parliamentary answer naming lead sites (government, accessed 1 Oct 2026)
- Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026) (government, dated 5 Aug 2026, accessed 6 Oct 2026)
- Department of Atomic Energy: written answer to Lok Sabha unstarred question 2841, Nuclear Energy Mission and Bharat Small Modular Reactors (5 August 2026) (government, dated 5 Aug 2026, accessed 6 Oct 2026)
Evidence and open questions
(3 notes)
- Evidence review. The Press Information Bureau page first attached returned an an access refusal (HTTP 403) Access Denied page on 19 October 2026, so no passage was read from it. The Department of Atomic Energy's written answers to Lok Sabha questions 2793 and 2841 of 5 August 2026 say BARC is designing and developing an HTGCR of up to 5 MWth as a demonstration nuclear heat source for hydrogen production, and that the proposed site is BARC, Vizag. Neither names the coolant gas, the moderator or the neutron spectrum. The gas-cooled family rests on the design's name. Last checked 19 Oct 2026. DAE parliamentary answer naming lead sites; Department of Atomic Energy: written answer to Lok Sabha unstarred question 2841, Nuclear Energy Mission and Bharat Small Modular Reactors (5 August 2026); Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)
What would change this
A readable copy of the DAE parliamentary answer or a BARC technical description of the HTGCR (coolant gas, moderator and spectrum), or a regulatory (AERB) siting or design document for the Vizag demonstration reactor. Next scheduled check: 19 Jan 2027.
- Coolant: Not disclosed in the reviewed evidence. The Department of Atomic Energy's answers of 5 August 2026 do not name the coolant gas. The design's name says gas-cooled but does not name the gas, so helium is not inferred. The first attached source is an access-refusal page (HTTP 403). Last checked 4 Nov 2026. Department of Atomic Energy: written answer to Lok Sabha unstarred question 2841, Nuclear Energy Mission and Bharat Small Modular Reactors (5 August 2026); DAE parliamentary answer naming lead sites
What would change this
A BARC or DAE technical description of the HTGCR naming the primary coolant (for example helium), which would settle the coolant field. Next scheduled check: 19 Jan 2027.
- Neutron spectrum: Not disclosed in the reviewed evidence. The Department of Atomic Energy's answers of 5 August 2026 do not state the neutron spectrum or moderator. The first attached source is an access-refusal page (HTTP 403). Last checked 4 Nov 2026. Department of Atomic Energy: written answer to Lok Sabha unstarred question 2841, Nuclear Energy Mission and Bharat Small Modular Reactors (5 August 2026); DAE parliamentary answer naming lead sites
What would change this
A BARC design paper or AERB document describing the HTGCR moderator and neutron spectrum. Next scheduled check: 19 Jan 2027.