Projects / India · Siting
BARC Visakhapatnam HTGCR hydrogen demonstration proposal
DAE names BARC Vizag for an up-to-5 MWth hydrogen reactor.
Current status
- How current
- General record check . Bounded evidence review . 1 of 3 listed sources has a publication or document date recorded here: 5 Aug 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
Newest recorded development . Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- Mar 2026 · Recorded development: BARC Visakhapatnam hydrogen reactor: siting consent and environmental terms of reference reported. DAE's written answers state siting consent received and environmental-clearance terms of reference issued; the consent's date and issuing body are not stated. Source: Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026) (dated 5 Aug 2026). Updates entry
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Thermal demonstration capacity is not electrical output or commercial operation. December 2025 written answers place it at BARC's Vizag R&D campus. DAE's 2026 written answers state in-principle approval, a prepared project report, siting consent received and the environment ministry's terms of reference for environmental clearance issued; construction has not started and the consent's date and issuing body are not stated.
Key facts
- Technology
- High-temperature gas-cooled reactor (HTGR) · unknown
- Operator(s)
- Not recorded
- Vendor for linked design
- Bhabha Atomic Research Centre
- Location
- BARC Vizag campus · India · precision: site area (named plant, laboratory, base, port, campus or parcel)
OSM research-institute point for the BARC Vizag campus, the named host; the reactor's position within the campus is not published. Geocode: Query 'BARC Vizag' -> amenity=research_institute 'BARC Vizag, MDR01, Cheepurupalle, Atchutapuram, Anakapalli, Andhra Pradesh, 531020, India'. (Query 'Bhabha Atomic Research Centre' returns the Mumbai campus; not used.) - Coordinates
- 17.532481, 83.031612 · site-area point (approximate)
- Electrical capacity
- thermal only (no MWe) · scope: module
- Thermal capacity
- 5 MWth (nameplate; basis unspecified)
- Modules planned
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 6 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
BARC Visakhapatnam HTGCR hydrogen demonstration proposal is recorded at BARC Vizag campus, Andhra Pradesh, India. Operator: No operator is recorded. Recorded vendor: Bhabha Atomic Research Centre. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: 'BARC Vizag' (amenity=research_institute), Atchutapuram, Anakapalli
This project is recorded as thermal only (no MWe). Module count is not recorded. Recorded thermal output is 5 MWth (nameplate; basis unspecified).
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Reactor supplier
- Vendor for the linked designBhabha Atomic Research Centre
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
- Customer or offtaker
The Department of Atomic Energy's 5 August 2026 Lok Sabha answer and World Nuclear News of 10 December 2025 describe the Vizag reactor as an up-to-5 MWth demonstration intended to be coupled with a chemical process for hydrogen production. Neither names a buyer or user of the hydrogen or heat, a quantity, or an agreement. WNN: Maharashtra and Andhra Pradesh proposed for first Indian SMRs; Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)
- Contractor
The Department of Atomic Energy's 5 August 2026 Lok Sabha answer says in-principle approval for engineering and construction of the Vizag HTGCR has been received, siting consent has been received and environment-ministry terms of reference were issued. Those are government approvals for BARC's own demonstration, not a contract. No engineering, procurement or construction contractor is named, and construction has not started. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)
- Funding and government decisions
The Department of Atomic Energy's 5 August 2026 Lok Sabha answer states a Nuclear Energy Mission provision of Rs 20,000 crore for small modular reactor research, development and deployment as a class, not an allocation to the Vizag reactor. The same answer counts construction time from receipt of financial approval and does not say that approval has been given. No amount for this reactor is stated. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)
- Fuel
- No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.
The Department of Atomic Energy's 5 August 2026 Lok Sabha answer and World Nuclear News of 10 December 2025 name no fuel supply, fabricator or delivery for the Vizag HTGCR. They describe only its up-to-5 MWth capacity and hydrogen purpose. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)
- Comparable schedule revision
Comparable schedule revision not established. The Department of Atomic Energy's 5 August 2026 Lok Sabha answer gives one estimate, 60 to 72 months of construction from receipt of financial approval, for the demonstration reactors as a group. No source read gives an earlier and a later date for the same Vizag milestone. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)
Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
- Operator or intended licensed owner
- Site host or owner
- Programs and agreements naming the project
Timeline
Recorded developments
- · Recorded development
BARC Visakhapatnam hydrogen reactor: siting consent and environmental terms of reference reported - Announced · Announcement
BARC Visakhapatnam HTGCR hydrogen demonstration proposal documented
This project’s dated entries are in Updates, filtered to this project. New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(4 notes, 1 not yet reviewed)
- Evidence review. The Department of Atomic Energy's written answer to Lok Sabha unstarred question 2793, answered on 5 August 2026, says BARC has undertaken a high temperature gas cooled reactor of up to 5 MWth for hydrogen production as a demonstration reactor. For the HTGCR it states that in-principle approval for engineering and construction has been received, the proposed site is BARC, Vizag, siting consent has been received, and terms of reference for environmental clearance have been received from the environment ministry (MoEF&CC). World Nuclear News (10 December 2025), reporting earlier written answers, says the 5 MWt reactor, intended to be coupled with a chemical process for hydrogen production, is proposed for construction at BARC's Vizag R&D campus in Andhra Pradesh. The answer gives 60 to 72 months for construction of the demonstration SMRs from receipt of financial approval, so financial sanction and environmental clearance are the next documentary decisions. The stored 5 MWth thermal-only rating, BARC as developer, the Vizag site and the siting stage stay; DAE's figure is an 'up to' ceiling, while WNN states 5 MWt. The opened answer neither mentions a prepared project report nor dates the siting consent, so the stored March 2026 event date is not supported by this text. The PIB release returned an access refusal (HTTP 403) and was not read. Last checked 19 Oct 2026. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026); WNN: Maharashtra and Andhra Pradesh proposed for first Indian SMRs
What would change this
A DAE or BARC record of financial (administrative and financial) sanction for the Vizag HTGCR, or the environment ministry's environmental clearance letter for it. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. With in-principle approval, siting consent and environmental terms of reference in hand, the next steps shown in DAE's August 2026 answer are environmental clearance and financial approval; it estimates construction at 60 to 72 months from receipt of financial approval. No date for either decision is given. Last checked 23 Oct 2026. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)
What would change this
Environmental clearance or financial sanction for the Vizag HTGCR. Next scheduled check: 23 Apr 2027.
- Permissions and public process. DAE's written answer of 5 August 2026 says the hydrogen-production HTGCR has in-principle approval for engineering and construction, that siting consent for the BARC Vizag site has been received, and that the environment ministry has issued terms of reference for environmental clearance. Terms of reference start the clearance process; they are not the clearance itself, and the answer does not give the date or issuing body of the siting consent. Last checked 23 Oct 2026. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)
What would change this
Grant of environmental clearance by the environment ministry, or a dated AERB consent for the Vizag HTGCR. Next scheduled check: 23 Apr 2027.
- Site dependencies (land, grid, water). World Nuclear News reported in December 2025 that the 5 MWt hydrogen-production HTGCR is proposed for BARC's Vizag R&D campus, and DAE's August 2026 answer says siting consent for that site has been received. The campus is an existing BARC site; the sources reviewed do not describe the hydrogen process plant connection, water supply or other infrastructure arrangements. Last checked 23 Oct 2026. WNN: Maharashtra and Andhra Pradesh proposed for first Indian SMRs; Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)
What would change this
An environmental impact assessment or clearance for the Vizag HTGCR describing site infrastructure. Next scheduled check: 23 Apr 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(1 of 3 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(3)
- DAE parliamentary answer naming lead sites (government, accessed 1 Oct 2026)
- WNN: Maharashtra and Andhra Pradesh proposed for first Indian SMRs (news report, accessed 2 Oct 2026)
- Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026) (government, dated 5 Aug 2026, accessed 6 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: BARC Visakhapatnam HTGCR hydrogen demonstration proposal — https://smrmap.com/projects/barc-vizag-htgcr/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “BARC Visakhapatnam HTGCR hydrogen demonstration proposal”. Record reviewed 6 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/barc-vizag-htgcr/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.