Bharat Small Modular Reactor (BSMR-200)
BARC's January 2026 BSMR-200 presentation describes a pressurized water reactor and gives about 220 MWe and 760 MWth for the single reactor, without a gross or net basis. DAE's 5 August 2026 answer to Parliament says capacity augmentation of the BSMR-200 to 300 MWe is envisaged; Mint reports a BSMR-300 project report released on 14 August 2026. Whether BSMR-300 is a separate design or the uprated BSMR-200 is unresolved, so the 300 MWe figure is not assigned to this profile.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- Siting: Tarapur BSMR-200 lead proposal.
- Evidence
- 4 sources; first primary source: DAE parliamentary answer naming lead sites. Record reviewed 6 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
BARC, the developer, describes BSMR-200 as a pressurised water reactor based plant in its January 2026 presentation. - Coolant
- Light water
- Developer / vendor(s)
- Bhabha Atomic Research Centre
- Module electrical
- 220 MWe (gross/net unspecified)
- Module thermal
- 760 MWth (nameplate; basis unspecified)
- Fuel form
- UO2
- Enrichment
- < 5%
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 6 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(1 without a known value)
- Spectrum
- Not recorded
Tracked deployment projects
- Tarapur BSMR-200 lead proposal — Siting · India
Design sources
(4)
- DAE parliamentary answer naming lead sites (government, accessed 1 Oct 2026)
- Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026) (government, dated 5 Aug 2026, accessed 6 Oct 2026)
- Mint: BARC and NPCIL release the BSMR-300 project report; commercial vehicle talks (17 September 2026) (news report, accessed 6 Oct 2026)
- scitalks.tifr.res.in: Bharat Small Modular Reactor (BSMR-200) (government, published Jan 2026, accessed 14 Oct 2026)
Evidence and open questions
(3 notes)
- Evidence review. DAE's written answer to Lok Sabha question 2793 (5 August 2026) says BARC has undertaken design, development and deployment of the 220 MWe Bharat Small Modular Reactor (BSMR-200) as a demonstration reactor, that in-principle approval for engineering and construction has been received, that the Atomic Energy Commission has cleared the administrative and financial sanction proposal and approved Tarapur, Maharashtra as the site, and that capacity augmentation to 300 MWe is envisaged. BARC's DAE Conclave presentation (January 2026) describes BSMR-200 as a pressurised water reactor plant using enriched UO2 fuel (below 5%), with a reactor pressure vessel and soluble boron, rated about 220 MWe / 760 MWth, with the lead unit at the Tarapur Atomic Power Station site. Mint (17 September 2026) reports that BARC and NPCIL released a detailed project report for a 300 MWe BSMR-300 on 14 August; whether it is a separate design is not settled by the opened sources. The stored BARC vendor, light-water coolant, 220 MWe (unspecified basis), UO2 fuel and '< 5%' enrichment stay, and the Tarapur deployment link is supported; no opened source states the neutron spectrum. The PIB release returned an access refusal (HTTP 403) and was not read; the stored summary's 'unspecified parameters remain unknown' is stale, since the BARC deck gives the 760 MWth thermal rating. Last checked 19 Oct 2026. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026); scitalks.tifr.res.in: Bharat Small Modular Reactor (BSMR-200); Mint: BARC and NPCIL release the BSMR-300 project report; commercial vehicle talks (17 September 2026)
What would change this
Administrative and financial sanction of the Tarapur BSMR-200 or an AERB siting/construction consent, or a BARC/NPCIL document defining BSMR-300 relative to BSMR-200. Next scheduled check: 19 Jan 2027.
- Neutron spectrum: Not disclosed in the reviewed evidence. The readable sources call BSMR-200 a pressurised water reactor without a heavy water moderator, using enriched UO2, but none states the neutron spectrum; thermal is not written into the field by inference. The PIB release (403) was not read. Last checked 19 Oct 2026. scitalks.tifr.res.in: Bharat Small Modular Reactor (BSMR-200)
What would change this
A BARC design paper or the BSMR-200 preliminary safety report stating the light-water moderation and thermal neutron spectrum explicitly. Next scheduled check: 19 Jan 2027.
- Technology family. BARC, the developer, describes BSMR-200 as a pressurised water reactor based plant in its January 2026 presentation. Last checked 3 Nov 2026. scitalks.tifr.res.in: Bharat Small Modular Reactor (BSMR-200)
What would change this
A BARC, NPCIL or AERB document that changes the BSMR-200 reactor type or layout. Next scheduled check: 3 Feb 2027.