Projects / India · Siting

Tarapur BSMR-200 lead proposal

DAE names Tarapur for a 220 MWe BSMR-200 lead unit.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . 1 of 5 listed sources has a publication or document date recorded here: 5 Aug 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
Aug 2026 · Recorded development: Tarapur approved as site for BSMR-200 and SMR-55 lead units, DAE tells Parliament. Written answers to Parliament posted in August and September 2026 state that the Atomic Energy Commission approved Tarapur as the site and gave in-principle approval for engineering and construction. Source: Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026) (dated 5 Aug 2026). Updates entry
More on this development

Sanction and regulator consent are not reported.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

Product name does not imply 200 MWe. This is separate from existing Tarapur BWR and PHWR plants. Written parliamentary answers in December 2025 propose the Tarapur Atomic Power Station site for the lead BSMR-200. DAE's 2026 written answers state in-principle approval for engineering and construction, Atomic Energy Commission approval of Tarapur as the site, clearance of the sanction proposal with the Empowered Technology Group's approval, a cost of about Rs 5,960 crore and construction of 60 to 72 months after sanction; the answers also say capacity augmentation to 300 MWe is envisaged. Cabinet sanction and regulator consent are not reported. Bharat Small Reactors (220 MWe heavy-water units offered to industry) are a different program.

Key facts

Design
Bharat Small Modular Reactor (BSMR-200) (SMR)
Technology
Pressurized water reactor (PWR) · light water. BARC, the developer, describes BSMR-200 as a pressurised water reactor based plant in its January 2026 presentation.
Operator(s)
Not recorded
Vendor for linked design
Bhabha Atomic Research Centre
Location
Tarapur · India · precision: site area (named plant, laboratory, base, port, campus or parcel)
Coordinates of the named Tarapur nuclear power plant from the NuclearChain reactors export (CC BY 4.0; derived from GEM's tracker); BSMR-200 lead proposal at Tarapur.
Coordinates
19.8294, 72.6617 · site-area point (approximate)
Electrical capacity
220 MWe (gross/net unspecified) · scope: module
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
6 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Tarapur BSMR-200 lead proposal is recorded at Tarapur, Maharashtra, India. Operator: No operator is recorded. Recorded vendor: Bhabha Atomic Research Centre. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate). Other records at this site: Tarapur SMR-55 lead proposal.

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'tarapur-nuclear-power-plant-5' (19.8294, 72.6617)

Recorded electrical output is 220 MWe (gross/net unspecified), scope module. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 760 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Fuel
  • Fuel form stated for Bharat Small Modular Reactor (BSMR-200)UO2
  • Enrichment stated for Bharat Small Modular Reactor (BSMR-200)< 5%
No project-specific fuel supply arrangement is recorded as a structured fact.

The Department of Atomic Energy's 5 August 2026 Lok Sabha answer describes indigenous development of BSMR-200 components and an in-house control-rod drive, and World Nuclear News of 10 December 2025 describes the design. Neither names a fuel supplier, fabrication or delivery for the Tarapur lead unit. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

The Department of Atomic Energy's 5 August 2026 Lok Sabha answer calls the BSMR-200 a demonstration reactor and names no buyer of its power, and World Nuclear News of 10 December 2025 names none either. NPCIL's request for proposals for captive industrial use concerns the separate Bharat Small Reactor program. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

Contractor

The Department of Atomic Energy's 5 August 2026 Lok Sabha answer says BARC is designing and deploying the 220 MWe BSMR-200, that in-principle approval for engineering and construction has been received and that the Atomic Energy Commission approved Tarapur as the site. These are government approvals for BARC's own demonstration. No engineering or construction contractor is named, and Indian industries are mentioned only generally for component development. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

Funding and government decisions

The Department of Atomic Energy's 5 August 2026 Lok Sabha answer says the BSMR-200's proposal for administrative and financial sanction has been cleared by the Atomic Energy Commission with Empowered Technology Group approval, and counts construction time from receipt of financial approval, which it does not report. The only amount in the answer is the Rs 20,000 crore Nuclear Energy Mission provision for SMRs as a class. No sanctioned amount for Tarapur is stated. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

Comparable schedule revision

Comparable schedule revision not established. The Department of Atomic Energy's 5 August 2026 Lok Sabha answer gives one estimate, 60 to 72 months of construction from receipt of financial approval. World Nuclear News of 10 December 2025 described sanction as at an advanced stage, and the later answer reports the sanction proposal cleared. That is progress in approval status, not two dates for the same construction or operation milestone. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

Recorded developments

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes)
  • Evidence review. The Department of Atomic Energy says BARC has undertaken the design, development and deployment of the 220 MWe BSMR-200 as a demonstration reactor, and its written Lok Sabha answer of 5 August 2026 states that in-principle approval for engineering and construction has been received, that the administrative and financial sanction proposal has been cleared by the Atomic Energy Commission with Empowered Technology Group approval, and that the AEC has approved Tarapur, Maharashtra as the site. World Nuclear News (10 December 2025) reported the earlier parliamentary statement that the Tarapur Atomic Power Station site is proposed for the lead BSMR-200 unit. The same DAE answer estimates construction at 60 to 72 months from receipt of financial approval and says augmenting the BSMR-200 to 300 MWe is envisaged on its experience; financial approval itself is not reported. WNN calls the BSMR-200 a 200 MWe pressurised-water design while DAE gives 220 MWe; the stored 220 MWe follows DAE. The saved DAE text is a single answer and does not contain the stored cost of about Rs 5,960 crore, and the PIB answer page could not be opened (access refused), so that figure has no opened source; GEM's tracker page has no Tarapur SMR content. The stored 220 MWe module rating, BARC as vendor, empty operator list and siting stage stay. The next documentary decision is the government's administrative and financial sanction, followed by regulatory consents from AERB. Last checked 19 Oct 2026. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026); WNN: Maharashtra and Andhra Pradesh proposed for first Indian SMRs
    What would change this

    A Union Cabinet or DAE administrative and financial sanction for the BSMR-200 lead unit, or an AERB siting consent for Tarapur, would change this record. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. The answers say the administrative and financial sanction proposal has been cleared within the atomic-energy establishment; formal sanction and AERB consents are not recorded as granted. They estimate 60 to 72 months for construction of the demonstration SMRs, which is a duration estimate, not a dated target. Last checked 23 Oct 2026. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)
    What would change this

    A recorded government sanction, AERB siting consent or construction start for the Tarapur BSMR-200 unit. Next scheduled check: 21 Jan 2027.

  • Permissions and public process. DAE's 2026 parliamentary answers report in-principle approval for engineering and construction, Atomic Energy Commission approval of Tarapur as the site, and Commission clearance of the administrative and financial sanction proposal with Empowered Technology Group approval. These are government program approvals. The answers record no AERB siting consent, construction license, environmental clearance or public hearing for the unit. Last checked 23 Oct 2026. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)
    What would change this

    An AERB siting or construction consent, environmental clearance or public-hearing notice for the Tarapur BSMR-200 unit. Next scheduled check: 21 Jan 2027.

  • Site dependencies (land, grid, water): Not disclosed in the reviewed evidence. The lead unit is proposed at the existing Tarapur Atomic Power Station site, which already hosts older boiling-water and heavy-water reactors, and the Atomic Energy Commission has approved the site. The opened sources give no land, grid-connection or cooling-water arrangement for the new unit. Last checked 23 Oct 2026. WNN: Maharashtra and Andhra Pradesh proposed for first Indian SMRs; Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)
    What would change this

    A DAE, NPCIL or AERB document describing land, grid or cooling arrangements for the Tarapur BSMR-200 unit. Next scheduled check: 21 Jan 2027.

  • Spent fuel, waste and closure. World Nuclear News reported in March 2025 that the minister told parliament BSMR used fuel will be handled and stored on site, in line with India's policy of reprocessing to recover useful material and vitrifying the remaining waste, but that reprocessing technology for SMRs has to be re-engineered for their fuel. That is a stated approach for the design, not a project-specific storage or disposal arrangement for the Tarapur lead unit. Last checked 23 Oct 2026. WNN: Minister updates parliament on Indian SMR project
    What would change this

    A DAE, NPCIL or AERB document setting the spent fuel and waste arrangement for the Tarapur BSMR-200. Next scheduled check: 23 Oct 2027.

Evidence dates

(1 of 5 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated listed source document: Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026): 5 Aug 2026.Latest dated recorded event: Tarapur: DAE tells Parliament the Atomic Energy Commission approved the site for the BSMR-200 and SMR-55 lead units: Aug 2026.4 of 5 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(5)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Tarapur BSMR-200 lead proposal — https://smrmap.com/projects/tarapur-bsmr-200/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Tarapur BSMR-200 lead proposal”. Record reviewed 6 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/tarapur-bsmr-200/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.