CAREM-25
Argentine integral PWR prototype. IAEA RDS-2/46 lists CAREM25 at 100 MWth, 29 MWe gross and 25 MWe net. The 25 MWe recorded here is that net figure. The 2024 catalog's about 30 MWe is not recorded as a second rating. CNEA's catalog figures give UO2 pellets and 3.1 percent enrichment for the prototype.
- Reactor type
- Integral pressurized water reactor. How it works, with a 3D view.
- Projects
- No live project recorded here; 1 suspended (CAREM-25).
- Evidence
- 5 sources; first primary source: IAEA Advanced Reactors Information System (ARIS). Record reviewed 19 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Integral pressurized water reactor (iPWR)
- Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s)
- CNEA (Argentina)
- Module electrical
- 25 MWe (net)
- Module thermal
- 100 MWth (nameplate; basis unspecified)
- Fuel form
- UO2 pellet
- Enrichment
- 3.1% for the CAREM25 prototype, as given by CNEA in the 2024 IAEA catalog.
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 19 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- CAREM-25 — Suspended · Argentina
Design sources
(5)
- IAEA Advanced Reactors Information System (ARIS) (IAEA/NEA, accessed 1 Oct 2026)
- World Nuclear Association — Small Nuclear Power Reactors (directory or tracker, accessed 1 Oct 2026)
- IAEA PRIS statistics: reactors by country code (Argentina), captured 9 October 2026 (IAEA/NEA, accessed 9 Oct 2026)
- IAEA: Nuclear Power Reactors in the World, Reference Data Series No. 2, 2026 edition (IAEA-RDS-2/46, September 2026) (IAEA/NEA, accessed 9 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition: CAREM (IAEA/NEA, accessed 19 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. CNEA's section of the 2024 IAEA SMR catalog (third edition, June 2025) describes CAREM as an Argentine integral PWR with natural circulation and self-pressurisation, intended for electricity supply to regions with small demand, and CAREM25 as its demonstration prototype developed with domestic technology. The catalog tabulates CAREM25 at 100 MW(t) / ~30 MW(e) and says its basic design is complete, detail design 90% complete, a construction license granted and a commissioning license request in preparation. Live IAEA PRIS data captured on 19 October 2026 list CAREM25 at the Atucha-CAREM site as an under-construction integrated PWR of 100 MWt, 29 MWe gross and 25 MWe net, operated and supplied by CNEA, which ties the design to the linked CAREM-25 project. No attached source records the construction halt held on the linked project, so 'under construction' here reflects PRIS and the catalog edition, not a confirmed resumption. The stored CNEA vendor, iPWR family, light-water coolant, thermal spectrum (light-water moderated per PRIS), 100 MWth, 25 MWe net, UO2 pellet fuel and 3.1% enrichment stay supported. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition: CAREM; IAEA PRIS statistics: reactors by country code (Argentina), captured 9 October 2026
What would change this
A CNEA or Argentine government decision to resume or cancel CAREM25 construction, or an ARN commissioning-license action, or a PRIS status change to suspended. Next scheduled check: 19 Jan 2027.