4S
4S (super-safe, small and simple) is Toshiba's small sodium-cooled, pool-type fast reactor with metal fuel, at detailed design in the 2024 catalog.
- Reactor type
- Sodium-cooled fast reactor. How it works, with a 3D view.
- Projects
- No live project recorded here; 1 canceled (Toshiba 4S proposal at Galena, Alaska). Development status as stated in the catalog dated 14 Feb 2025: Detailed design.
- Evidence
- 2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Sodium-cooled fast reactor (SFR)
- Coolant
- Sodium
- Spectrum
- Fast
- Developer / vendor(s) as of 14 Feb 2025
- Toshiba Energy Systems & Solutions Corporation
- Fuel form
- Metal fuel (U-Zr alloy)
- Development status (as stated)
- Detailed design
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Toshiba 4S proposal at Galena, Alaska (mid-2000s) — Canceled · United States
Design sources
(2)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 238 - Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. Toshiba's section of the 2024 IAEA SMR catalog (third edition, June 2025) names Toshiba Energy Systems & Solutions Corporation as developer of the 4S (super-safe, small and simple), a small sodium-cooled pool-type fast reactor with U-Zr metal fuel. It is intended for electricity supply to remote areas and mining sites and for non-electric uses such as desalination and hydrogen production. The catalog offers two outputs, 30 MW(t) or 10 MW(e) and 135 MW(t) or 50 MW(e), with one reactor and one turbine generator per plant; gross versus net is not stated. As dated by that edition, US NRC pre-application licensing activities began in 2007 (four meetings by 2008, 14 technical reports by 2013) and Toshiba is conducting detailed design and safety analysis for design approval while looking for customers; this is a design-stage history, not a license. No opened source names Galena, Alaska, so the linked Galena proposal is not connected by these sources. The stored vendor, SFR family, sodium coolant, fast spectrum, metal U-Zr fuel and 'Detailed design' status stay; the rating stays off this identity profile. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A newer IAEA catalog edition or a Toshiba/NRC filing reviving the 4S design approval, or a named customer agreement. Next scheduled check: 19 Jan 2027.
- Module rating. The catalog states two outputs for the single-reactor 4S plant: 30 MW(t) or 10 MW(e), and 135 MW(t) or 50 MW(e); its table lists 30 / 10. Gross versus net is unspecified. The figure is not stored on this identity profile, which by standing rule carries no module rating. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A Toshiba design document fixing the reference 4S output and its gross or net basis. Next scheduled check: 19 Jan 2027.