EM2
Gas-cooled fast reactor. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.
- Reactor type
- Gas-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated in the catalog dated 14 Feb 2025: Conceptual design.
- Evidence
- 3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Gas-cooled fast reactor (GFR)
- Coolant
- Helium
- Spectrum
- Fast
- Developer / vendor(s) as of 14 Feb 2025
- General Atomics
- Fuel form
- UC
- Development status (as stated)
- Conceptual design
- Reactor vessel
- 12.5 m tall, 4.6 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 179.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.All vessels to scale10 m bar; a person 1.8 m tallEM2
12.5 m tall, 4.6 m across - Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(3)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 136 - IAEA ARIS design record: EM2 (IAEA/NEA, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The IAEA catalog describes the Energy Multiplier Module as General Atomics' helium-cooled fast reactor and states 500 MW(t) and 265 MW(e) per module, with 1060 MW(e) as a total. The NEA third edition calls it a gas-cooled fast reactor and says General Atomics has started pre-licensing activities for the Energy Multiplier Module. Stored helium coolant, fast spectrum and vendor stay. The family is GFR because helium coolant and a fast spectrum determine it. The catalog's section calls it a helium-cooled fast reactor while its summary table lists it as HTGR; the NEA profile calls it a gas-cooled fast reactor. The catalog output is not stored on this identity profile. The quotable pre-licensing sentence names no site, and linked deployments are empty. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
An NRC pre-application result or a General Atomics specification that revises the per-module output. Next scheduled check: 19 Jan 2027.
- Module rating. The catalog states 500 MW(t) and 265 MW(e) per module, and 1060 MW(e) total. The per-module figure is not stored on this identity profile. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A later developer or regulator specification that states this design's module output with an explicit basis. The figure would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.