Energy Well
Research Centre Řež modular reactor originally identified in the NEA February 2025 catalog. The developer page read 13 October 2026 specifies 20 MWth; the ÚJV brochure describes solid TRISO fuel and FLiBe coolant. SMRMap classifies that solid-fuel/salt-coolant arrangement as FHR; this is a technical classification inference. Electrical output is unknown. No deployment or authorization is established.
- Reactor type
- Fluoride salt-cooled high-temperature reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated in the catalog dated 14 Feb 2025: Pre-conceptual design.
- Evidence
- 4 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 13 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- Microreactor
- Technology
- Fluoride-salt-cooled high-temperature reactor (FHR)
- Coolant
- Molten salt
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- Research Centre Řež
- Module thermal
- 20 MWth (nameplate; basis unspecified)
- Fuel form
- TRISO
- Development status (as stated)
- Pre-conceptual design
- Reactor vessel
- 7 m tall, 3.5 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 407.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.All vessels to scale10 m bar; a person 1.8 m tallEnergy Well
7 m tall, 3.5 m across - Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Record reviewed
- 13 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(1 without a known value)
- Module electrical
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(4)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 124 - Energy Well: project technical description (company, accessed 13 Oct 2026)
- ÚJV: small modular reactor projects brochure (company, accessed 13 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The developer page says Energy Well is a small modular reactor from Research Center Řež with a capacity of 20 MW thermal, for electricity and especially heat. The UJV brochure table lists molten salt FLiBe as coolant and TRISO as fuel, with a thermal output of 20 MW. The NEA third edition describes a micro molten-salt-cooled reactor with solid prismatic HALEU TRISO fuel. Stored vendor, molten-salt coolant, thermal spectrum and the already stored 20 MW thermal rating stay. This review does not propose a rating change. The opened pages do not use the label FHR, so the stored family stays as that solid-fuel salt-coolant reading. The NEA siting line names no site. Last checked 19 Oct 2026. Energy Well: project technical description; ÚJV: small modular reactor projects brochure; NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
A developer revision of the 20 MW thermal capacity, or an electrical output with a stated basis. Next scheduled check: 19 Jan 2027.
- Module rating. The developer page states 20 MW thermal and the profile already stores that thermal rating. This identity-only review does not propose a rating field change. Last checked 19 Oct 2026. Energy Well: project technical description; ÚJV: small modular reactor projects brochure
What would change this
A later Research Centre Rez specification that changes the thermal capacity or states electrical output. Next scheduled check: 19 Jan 2027.