Designs

FLEX

Reactor design using separate fuel and coolant molten salts. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the catalog dated 14 Feb 2025: Pre-conceptual design.
Evidence
7 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 8 Oct 2026.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Molten salt reactor (MSR)
Coolant
Molten salt
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
MoltexFLEX
Fuel form
Molten salt fuel within vented fuel tubes
Development status (as stated)
Pre-conceptual design
Reactor vessel
7.5 m tall, 6 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 331.low pressure not an unqualified diameterSMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
10 m bar; a person 1.8 m tall
FLEX *
7.5 m tall, 6 m across
All vessels to scale
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
8 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(7)

Evidence and open questions

(2 notes)