Fast Modular Reactor concept. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.

Reactor type
Gas-cooled fast reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the catalog dated 14 Feb 2025: Conceptual design.
Evidence
3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of EM2, this type's example. On the left, a reactor vessel holds a core of fuel assemblies with reflectors around it and rods above it.
Schematic of EM2, this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Gas-cooled fast reactor (GFR)
Coolant
Helium
Spectrum
Fast
Developer / vendor(s) as of 14 Feb 2025
General Atomics
Fuel form
UO2
Development status (as stated)
Conceptual design
Reactor vessel
11 m tall, 4.6 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 183.a sealed containment vessel is described separately and is not this rowSMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
10 m bar; a person 1.8 m tall
FMR *
11 m tall, 4.6 m across
All vessels to scale
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(3)

Evidence and open questions

(2 notes)
  • Evidence review. The IAEA catalog describes the Fast Modular Reactor as a 100 MW thermal gas-cooled fast reactor developed by General Atomics Electromagnetic Systems, with helium coolant, for flexible electricity supply. The NEA third edition calls it a gas-cooled fast reactor and says General Atomics has started pre-licensing for the Fast Modular Reactor with the NRC. Stored helium coolant, fast spectrum and vendor stay. The family is GFR because helium coolant and a fast spectrum determine it. The catalog's section calls it a gas-cooled fast reactor while its summary table lists it as HTGR; the NEA profile calls it a gas-cooled fast reactor. The 100 MW thermal figure is not stored. No electrical output is stated in that catalog sentence. No site is named. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); NEA Small Modular Reactor Dashboard — Third Edition (2025)
    What would change this

    A General Atomics or NRC specification that states electrical output and confirms the 100 MW thermal module value. Next scheduled check: 19 Jan 2027.

  • Module rating. The catalog states 100 MW thermal for the FMR and describes helium coolant. It does not state electrical output in that passage. The thermal figure is not stored on this identity profile. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
    What would change this

    A later developer or regulator specification that states this design's module output with an explicit basis. The figure would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.