LFR-AS-200
Commercial lead-cooled fast-reactor design supported by LFR-AS-30 materials testing. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled. The NRC page updated 15 September 2026 records pre-application engagement since March 2026 for a 480 MWth pool-type lead-cooled MOX design with designed electrical output of 200 MWe, reactor docket 99902162. This does not settle the configuration or electrical basis of other versions. The separately referenced MOX fuel-facility docket was not reviewed and is not a reactor deployment.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- Siting: newcleo / JAVYS LFR-AS-200 study at Bohunice V1. Development status as stated in the catalog dated 14 Feb 2025: Conceptual, pre-licensing.
- Evidence
- 4 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Its projects in the table · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead
- Spectrum
- Fast
- Developer / vendor(s) as of 14 Feb 2025
- newcleo
- Fuel form
- MOX
- Development status (as stated)
- Conceptual, pre-licensing
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- newcleo / JAVYS LFR-AS-200 study at Bohunice V1 — Siting · Slovakia
Agreements naming this design (1)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- Ignalina NPP and newcleo memorandum to study LFR deployment feasibility in Lithuania — Cooperation agreement or MOU · Active · announced Jul 2025
Concerns Lithuania
Design sources
(4)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 192 - IAEA ARIS design record: LFR-AS-200 (IAEA/NEA, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
- NRC Newcleo Americas LFR-AS-200 pre-application overview (regulator, page updated 15 Sep 2026, accessed 17 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. newcleo's section of the 2024 IAEA SMR catalog (third edition, June 2025) describes the LFR-AS-200 as a pool-type lead-cooled fast reactor SMR with an amphora-shaped inner vessel, offering 200 MW(e) and able to use stockpiled plutonium in MOX fuel, for electricity and non-electric uses such as ammonia and hydrogen. The NRC pre-application page (updated 15 September 2026) says Newcleo Americas is developing the LFR-AS-200, a 480 MWth pool-type fast reactor with a designed electrical output of 200 MWe, cooled by lead at atmospheric pressure and using MOX fuel. As dated by those sources, newcleo is in the pre-licensing phase (pre-licensing discussions in France since 2023), and NRC pre-application engagement began in March 2026 under docket 99902162 with a regulatory engagement plan for which no review is requested; neither is a design approval. The NEA dashboard names newcleo's 2025 agreement with JAVYS of the Slovak Republic, the opened link to the linked Bohunice study. The stored newcleo vendor, LFR family, lead coolant, fast spectrum, MOX fuel and 'Conceptual, pre-licensing' status stay; the rating stays off this identity profile. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); NRC Newcleo Americas LFR-AS-200 pre-application overview; NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
An NRC topical report or design application review for the LFR-AS-200, an ONR GDA entry decision, or the JAVYS/newcleo feasibility decision for Bohunice. Next scheduled check: 19 Jan 2027.
- Module rating. The NRC page gives 480 MWth with a designed electrical output of 200 MWe, and the catalog gives 200 MW(e) per reactor; gross versus net is unspecified, and the catalog two-reactor building is a plant layout, not a module rating. The figure is not stored on this identity profile, which by standing rule carries no module rating. Last checked 19 Oct 2026. NRC Newcleo Americas LFR-AS-200 pre-application overview; Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
An LFR-AS-200 NRC topical report or GDA submission stating gross and net electrical output. Next scheduled check: 19 Jan 2027.