NHR200-II
Design based on the NHR-5 experimental reactor. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 4 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
INET, a 2021 Tsinghua journal article and the NEA SMR Dashboard describe an integrated pressurized water reactor, but none of the attached sources states that its heat exchangers sit inside the reactor vessel, so the integral classification is not recorded. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- INET and China General Nuclear Power Group
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Agreements naming this design (1)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- CGN and Tsinghua NHR200-II nuclear district-heating demonstration: NEA-approved preliminary work (2018) — Feasibility or siting study · Status not established · announced Jan 2018
Concerns China
Design sources
(4)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 148 - INET Tsinghua: NHR200-II project description (company, page updated Apr 2026, accessed 13 Oct 2026)
- INET Tsinghua: NHR key research area (English) (academic, accessed 20 Oct 2026)
- Journal of Tsinghua University: NHR200-II heating-market article (2021) (peer-reviewed, accessed 20 Oct 2026)
Evidence and open questions
(3 notes)
- Evidence review. The attached NEA SMR Dashboard was not quoted. INET's NHR200-II project page, updated April 2026, says Tsinghua University's Institute of Nuclear and New Energy Technology designed NHR200-II in 2006 from the NHR200-I type, as a small modular natural-circulation pressurized-water reactor for industrial steam, steam and water cogeneration, and hybrid seawater desalination, supplying 1.6 MPa, 201°C saturated steam. That page's 200 MW figures and the 1996 construction license sit in earlier sections, and the named Shenyang and Shandong approvals are labeled NHR200-I. The English INET research page also names INET as designer and discusses electricity, heat, water, and steam without a power figure. A 2021 Tsinghua University journal article calls NHR200-II an integrated pressurized-water reactor and says the technology is ready for demonstration; it states steam pressure, not megawatts. Neutron spectrum and fuel form are not stated. No module rating is stored on this identity-only profile, and the existing catalog attribution is retained. INET is explicitly identified as designer; these pages do not establish an exclusive developer list or disprove CGN involvement. Last checked 20 Oct 2026. INET Tsinghua: NHR200-II project description; INET Tsinghua: NHR key research area (English); Journal of Tsinghua University: NHR200-II heating-market article (2021)
What would change this
An INET specification that states NHR200-II thermal or electrical power apart from the NHR200-I 200 MW figure. Next scheduled check: 20 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The April 2026 INET page and the 2021 journal abstract were read. For NHR200-II they state 1.6 MPa saturated steam, not MWth or MWe. The 200 MW sentences are in the earlier NHR200-I section. This identity-only profile would not store a rating even if one were stated. Last checked 20 Oct 2026. INET Tsinghua: NHR200-II project description
What would change this
An INET data sheet that gives NHR200-II megawatts separately from NHR200-I. Next scheduled check: 20 Jan 2027.
- Technology family. INET, a 2021 Tsinghua journal article and the NEA SMR Dashboard describe an integrated pressurized water reactor, but none of the attached sources states that its heat exchangers sit inside the reactor vessel, so the integral classification is not recorded. Last checked 1 Nov 2026. INET Tsinghua: NHR200-II project description; Journal of Tsinghua University: NHR200-II heating-market article (2021); NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
A developer, regulator or IAEA document that states the NHR200-II's heat exchangers or whole primary circuit sit inside the reactor vessel. Next scheduled check: 1 Feb 2027.