ODIN
ODIN is a low-pressure-coolant microreactor design. Cambridge Atomworks, which designed ODIN for NANO Nuclear from 2023, says it has bought back that intellectual property and is now designing ODIN; World Nuclear News reported in September 2025 that NANO signed a letter of intent to sell the design and its intellectual property to Cambridge AtomWorks. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.
- Reactor type
- No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
- Projects
- Announced: Cambridge Atomworks ODIN prototype at Berkeley Green.
- Evidence
- 3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Its projects in the table · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- Microreactor
- Technology
- Other (see description)
- Coolant
- Molten salt
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- Cambridge Atomworks
- Enrichment
- up to 20% (HALEU)
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Cambridge Atomworks ODIN prototype at Berkeley Green — Announced · United Kingdom
Agreements naming this design (2)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- NANO Nuclear and DOE Idaho Operations Office memorandum to evaluate siting ZEUS and ODIN prototypes at INL — Cooperation agreement or MOU · Active · announced 4 Dec 2024
Concerns United States - NANO Nuclear Energy and Rwanda Atomic Energy Board memorandum on SMRs and microreactors (ZEUS, ODIN) — Cooperation agreement or MOU · Status not established · announced Aug 2024
Concerns Rwanda
Design sources
(3)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 182 - Cambridge Atomworks: about ODIN (company, accessed 2 Oct 2026)
- World Nuclear News: ODIN (news report, published 18 Sep 2025, accessed 14 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. Cambridge Atomworks' undated ODIN page says it was set up in January 2023 to design a transportable micro-reactor for NANO Nuclear Energy (NNE) and is currently designing ODIN, a low-pressure salt-cooled reactor with a fuel type in which moderator and fuel are co-located, cooled by natural circulation with air as the ultimate heat sink. It aims for a UK demonstration micro-reactor by the end of the decade and off-grid power by the early-to-mid 2030s, and says it has bought back the intellectual property generated for NNE. World Nuclear News (18 September 2025) reported NANO's letter of intent to sell ODIN and its IP to Cambridge AtomWorks, describing HALEU fuel up to 20% enrichment and a low-pressure coolant. As dated by the Atomworks page, the design was taken through a DOE pre-conceptual review at INL in August 2023, NNE began NRC regulatory engagement in October 2024, and the conceptual stage was expected in Q2 2026; none of this is an authorization. The page names a UK demonstrator but no site, so the linked Berkeley Green prototype is not located by these sources. The stored molten-salt coolant, 'other' family and 'up to 20% (HALEU)' enrichment stay; the stored NANO vendor is superseded by the sources, no opened source gives an output, and the stored thermal spectrum is not stated. Last checked 19 Oct 2026. Cambridge Atomworks: about ODIN; World Nuclear News: ODIN
What would change this
A Cambridge Atomworks announcement of a UK demonstrator site (for example Berkeley Green) or ONR/EA early engagement, or a design document stating ODIN's output. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. Neither the Atomworks page nor the WNN article states an ODIN thermal or electrical output; the rating appears only in the NEA dashboard, which is not reused. The rating would not be stored on this identity profile in any case. Last checked 19 Oct 2026. Cambridge Atomworks: about ODIN
What would change this
A Cambridge Atomworks technical specification or regulator engagement document stating the ODIN output. Next scheduled check: 19 Jan 2027.