Cambridge Atomworks ODIN prototype at Berkeley Green
Cambridge Atomworks' ODIN is a prototype microreactor proposed for the Berkeley Green Science and Technology Park in the United Kingdom, at the announced stage.
Current status
- How current
- General record check . Bounded evidence review . The listed source has no publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Cambridge Atomworks and Chiltern Vital Group announced a letter of intent in June 2026 under which Cambridge Atomworks would site a prototype ODIN research reactor at the Berkeley Green Science and Technology Park for a physics demonstration, with later use as a training reactor an objective. The letter's binding status is not stated, no licensing application is recorded, and output is not published.
Key facts
- Design
- ODIN (Microreactor)
- Technology
- Other · molten salt
- Operator(s)
- Not recorded
- Vendor for linked design
- Cambridge Atomworks
- Location
- Berkeley Green Science and Technology Park · United Kingdom · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain reactors export point for the former Berkeley nuclear power station (CC BY 4.0, derived from GEM's Global Nuclear Power Tracker). The station's Wikipedia article says the former Berkeley Nuclear Laboratories site and surrounding land became the science and technology park now named in the letter of intent; site-area point, no plot inside the park is published. - Coordinates
- 51.6927, -2.4938 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: module
- Thermal capacity
- Not recorded
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
Cambridge Atomworks ODIN prototype at Berkeley Green is recorded at Berkeley Green Science and Technology Park, England, United Kingdom. Operator: No operator is recorded. Recorded vendor: Cambridge Atomworks. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'berkeley-nuclear-power-plant-1' (51.6927, -2.4938)
Electrical output is not recorded on this project. Modules planned: 1. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Project proposer or applicant
- Project proposerCambridge Atomworks · source
- Reactor supplier
- Vendor for the linked designCambridge Atomworks
- Fuel
- Enrichment stated for ODIN (catalog profile as of 14 Feb 2025)up to 20% (HALEU)
Cambridge Atomworks' Berkeley Green letter-of-intent announcement names no fuel type, supplier, quantity or delivery for the ODIN prototype. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent
Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
- Customer or offtaker
Cambridge Atomworks' letter-of-intent announcement says the Berkeley Green prototype would answer physics and thermal-hydraulics questions for regulators and later serve as a training facility. It is a research prototype, and the announcement names no user or buyer of any heat or power. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent
- Contractor
Cambridge Atomworks' announcement says it and Chiltern Vital Group signed a letter of intent for ODIN research and development at the Berkeley Green Science and Technology Park, which Chiltern Vital Berkeley owns and is developing. That is the site developer agreeing to host the vendor's prototype, not a contractor appointment, and no engineering or construction contractor is named. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent
- Funding and government decisions
Cambridge Atomworks' Berkeley Green letter-of-intent announcement states no funder, amount or financing for the ODIN prototype. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent
- Comparable schedule revision
Comparable schedule revision not established. Cambridge Atomworks' Berkeley Green letter-of-intent announcement gives no construction, criticality or operation date for the ODIN prototype. With no dated target there is nothing to revise. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent
Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
- Operator or intended licensed owner
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(4 notes, 2 not yet reviewed)
- Evidence review. Cambridge Atomworks' page announces a letter of intent with Chiltern Vital Group to do research and development on the ODIN nuclear micro-reactor at the Berkeley Green Science and Technology Park. Chiltern Vital Berkeley is described as the group company that owns and is developing the Berkeley project. The page's dateline under the headline is only "29 Jun", with no year beside it; the footer copyright line is 2026, which is not treated here as the letter's date. The company says the Berkeley prototype is to answer physics and thermal-hydraulics questions, and that using it later as a training reactor is an objective after the physics demonstration. No electrical or thermal rating, license application, or statement of whether the letter is binding appears. Chiltern has no organization id, so no site-host role is proposed. The stored vendor, ODIN design link, one module and announced stage stay. The park is named and no coordinates are stated, so the only field change records the park as a named site. Last checked 20 Oct 2026. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent
What would change this
A binding Berkeley site agreement, a dated year on the letter of intent, or a UK licensing application for the ODIN prototype at Berkeley Green. Next scheduled check: 20 Jan 2027.
- Site location recorded as disclosed. The letter-of-intent page names the Berkeley Green Science and Technology Park as the place for the ODIN prototype. It gives no coordinates and no plot inside the park, so the map uses a site-area point for the former Berkeley nuclear site that the park occupies. Last checked 20 Oct 2026. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent
What would change this
A plan or application that places the prototype on a stated plot inside Berkeley Green, or that withholds the park name. Next scheduled check: 20 Jan 2027.
- Permissions and public process. Cambridge Atomworks' 29 June 2026 item announces a letter of intent with Chiltern Vital Group to site a prototype ODIN research reactor at the Berkeley Green Science and Technology Park, which it calls a step forward in ODIN's regulatory development. A letter of intent is not a permission; no nuclear site license, planning application or consultation for the prototype is shown in the sources reviewed. Last checked 23 Oct 2026. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent
What would change this
An ONR licensing application or planning application for the ODIN prototype at Berkeley Green. Next scheduled check: 23 Apr 2027.
- Site dependencies (land, grid, water). The June 2026 item says the prototype would sit on the Berkeley Green Science and Technology Park, owned and being developed by Chiltern Vital Berkeley, under a letter of intent. The plot within the park, lease terms and any utility or cooling arrangements are not described. Last checked 23 Oct 2026. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent
What would change this
A lease or site agreement, or planning documents for the ODIN prototype at Berkeley Green. Next scheduled check: 23 Apr 2027.
Not yet reviewed against sources: Spent fuel, waste and closure; Next decision and prerequisites. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(0 of 1 source with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(1)
- Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent (company, accessed 2 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Cambridge Atomworks ODIN prototype at Berkeley Green — https://smrmap.com/projects/odin-berkeley-green/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Cambridge Atomworks ODIN prototype at Berkeley Green”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/odin-berkeley-green/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.