TEPLATOR

TEPLATOR is a heat-only reactor concept from the University of West Bohemia and Czech Technical University in Prague. The developer's 2024 material describes a heavy-water cooled and moderated design using VVER-440 fuel at 50-150 MWt, including a planned 50 MWt TEPLATOR DEMO without a named site. This dated profile does not confirm current availability or authorization.

Reactor type
No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
Projects
Announced: TEPLATOR heat-only reactor for Slavutych district heating.
Evidence
3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Other (see description)
Coolant
Other (see description)
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
University of West Bohemia and Czech Technical University in Prague
Fuel form
VVER-440 spent fuel assemblies
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

Design sources

(3)

Evidence and open questions

(2 notes)
  • Evidence review. The TEPLATOR section of the 2020 IAEA SMR book, supplied by UWB Pilsen and CIIRC CTU (Czech Republic), describes a district and process heat reactor whose fuel channels sit in a calandria cooled and moderated by heavy water (D2O), reusing irradiated VVER-440 or other LWR fuel assemblies at low pressure and producing no electricity. That edition gives the initial TEPLATOR at 50 MW(t), with variants between 50 and 200 MW(t), while the June 2024 CTU/UWB presentation gives 50-150 MW thermal depending on variant; all are thermal-only figures and the variant ranges differ between the two dates. As dated by the 2020 book, preconceptual design was complete and preliminary/basic design was to start in Q4 2020; the 2024 presentation lists a VDR in Canada and finalising basic design only as future steps, so no licensing step is evidenced. The NEA dashboard (assessment cutoff February 2025) describes a 2023 agreement with the Ukrainian city of Slavutych to explore deploying a TEPLATOR there, which connects the linked Slavutych deployment as an exploratory proposal. The stored UWB/CTU vendor, 'other' family, 'other' (heavy-water) coolant and VVER-440 fuel form match the sources; no opened source states the stored thermal neutron spectrum, and the rating stays off this identity profile. Last checked 19 Oct 2026. IAEA 2020 SMR book: HTR-10 technical table; R. Škoda (CTU/UWB): TEPLATOR presentation; NEA Small Modular Reactor Dashboard — Third Edition (2025)
    What would change this

    A CTU/UWB or World ThermoExport document fixing the first-of-a-kind TEPLATOR rating and licensing route, or a Ukrainian or Czech regulatory filing for a TEPLATOR unit. Next scheduled check: 19 Jan 2027.

  • Module rating. The 2020 IAEA SMR book gives the initial TEPLATOR at 50 MW(t) with no electricity output and variants of 50 to 200 MW(t); the June 2024 developer presentation gives 50-150 MW thermal by variant. Both are thermal-only ratings for one reactor, with the variant ranges differing by date. By standing rule no figure is stored on this identity profile. Last checked 19 Oct 2026. IAEA 2020 SMR book: HTR-10 technical table; R. Škoda (CTU/UWB): TEPLATOR presentation
    What would change this

    A CTU/UWB design document fixing the first-of-a-kind (DEMO) thermal rating, or a newer IAEA catalog entry for TEPLATOR. Next scheduled check: 19 Jan 2027.