Thorizon One
Thorizon cartridge-core fast-spectrum molten-salt reactor, originally identified in the NEA February 2025 catalog. The developer technical paper read 13 October 2026 gives 250 MWth and approximately 100 MWe per reactor; gross/net electrical basis is unspecified. The April 2026 MoU targets commercial realization in 2034, while the paper targets construction start in 2032. These are different milestones. The ENSREG 3 March 2026 dashboard marked the joint preparatory review halted; the later developer statements do not establish resumption or a license. Separate from PIONEER and non-nuclear PILOT.
- Reactor type
- Molten salt reactor. How it works, with a 3D view.
- Projects
- Announced: Thorizon One first commercial molten-salt reactor in Zeeland.
- Evidence
- 4 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 13 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Its projects in the table · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Molten salt reactor (MSR)
- Coolant
- Molten salt
- Spectrum
- Fast
- Developer / vendor(s) as of 14 Feb 2025
- Thorizon
- Module electrical
- approximately 100 MWe (gross/net unspecified)
- Module thermal
- 250 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 13 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- Thorizon One first commercial molten-salt reactor in Zeeland — Announced · Netherlands
Agreements naming this design (2)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- Thorizon–TNO molten-salt reactor materials program — Research program · Active · announced 14 Oct 2026
Concerns Netherlands - Thorizon-led Project Pronto under the Dutch MOOI Kernenergie scheme — Research program · Active · announced 2 Jul 2026
Concerns Netherlands
Design sources
(4)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 234 - ENSREG SMR Task Force dashboard, third edition (3 March 2026) (government, accessed 6 Oct 2026)
- Thorizon: cartridge-core molten salt reactor technical paper (company, accessed 13 Oct 2026)
- Thorizon: EPZ, NRG PALLAS, provinces and investors sign MoU (company, dated 16 Apr 2026, accessed 13 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. Thorizon's technical paper for the IAEA FR26 conference describes Thorizon One as a 250 MWth fast-spectrum molten salt reactor with a patented cartridge core, producing approximately 100 MWe plus 550°C supercritical steam for electricity and industrial heat; Thorizon is a Franco-Dutch developer spun off from NRG. The 250 MWth and approximately 100 MWe are per-reactor figures with the electrical basis (gross or net) unstated, and Thorizon's 16 April 2026 MoU release likewise calls Thorizon One a 100 MWe first commercial reactor. The paper says Thorizon is in pre-licensing review phases led by ANVS and targets construction start by 2032, whereas the ENSREG dashboard of 3 March 2026 lists the joint French-Dutch preparatory review as halted in 2026; neither is a license, and the opened sources do not reconcile the two statements. The MoU advances validation of a Zeeland site, with EPZ having assessed the Borssele site and investigating becoming owner, licensee and operator, which connects the linked Zeeland deployment as a proposal targeted for 2034. The stored Thorizon vendor, MSR family, molten-salt coolant, fast spectrum and 250 MWth / approximately 100 MWe ratings, with no stated basis, match these sources. Last checked 19 Oct 2026. Thorizon: cartridge-core molten salt reactor technical paper; ENSREG SMR Task Force dashboard, third edition (3 March 2026); Thorizon: EPZ, NRG PALLAS, provinces and investors sign MoU
What would change this
An ANVS or ASNR statement on whether the Thorizon preparatory review has resumed, the next ENSREG dashboard edition, or a Thorizon One license application for the Borssele/Zeeland site. Next scheduled check: 19 Jan 2027.