Thorizon cartridge-core fast-spectrum molten-salt reactor, originally identified in the NEA February 2025 catalog. The developer technical paper read 13 October 2026 gives 250 MWth and approximately 100 MWe per reactor; gross/net electrical basis is unspecified. The April 2026 MoU targets commercial realization in 2034, while the paper targets construction start in 2032. These are different milestones. The ENSREG 3 March 2026 dashboard marked the joint preparatory review halted; the later developer statements do not establish resumption or a license. Separate from PIONEER and non-nuclear PILOT.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Projects
Announced: Thorizon One first commercial molten-salt reactor in Zeeland.
Evidence
4 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 13 Oct 2026.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Molten salt reactor (MSR)
Coolant
Molten salt
Spectrum
Fast
Developer / vendor(s) as of 14 Feb 2025
Thorizon
Module electrical
approximately 100 MWe (gross/net unspecified)
Module thermal
250 MWth (nameplate; basis unspecified)
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
13 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Agreements naming this design (2)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(4)

Evidence and open questions

(1 note)
  • Evidence review. Thorizon's technical paper for the IAEA FR26 conference describes Thorizon One as a 250 MWth fast-spectrum molten salt reactor with a patented cartridge core, producing approximately 100 MWe plus 550°C supercritical steam for electricity and industrial heat; Thorizon is a Franco-Dutch developer spun off from NRG. The 250 MWth and approximately 100 MWe are per-reactor figures with the electrical basis (gross or net) unstated, and Thorizon's 16 April 2026 MoU release likewise calls Thorizon One a 100 MWe first commercial reactor. The paper says Thorizon is in pre-licensing review phases led by ANVS and targets construction start by 2032, whereas the ENSREG dashboard of 3 March 2026 lists the joint French-Dutch preparatory review as halted in 2026; neither is a license, and the opened sources do not reconcile the two statements. The MoU advances validation of a Zeeland site, with EPZ having assessed the Borssele site and investigating becoming owner, licensee and operator, which connects the linked Zeeland deployment as a proposal targeted for 2034. The stored Thorizon vendor, MSR family, molten-salt coolant, fast spectrum and 250 MWth / approximately 100 MWe ratings, with no stated basis, match these sources. Last checked 19 Oct 2026. Thorizon: cartridge-core molten salt reactor technical paper; ENSREG SMR Task Force dashboard, third edition (3 March 2026); Thorizon: EPZ, NRG PALLAS, provinces and investors sign MoU
    What would change this

    An ANVS or ASNR statement on whether the Thorizon preparatory review has resumed, the next ENSREG dashboard edition, or a Thorizon One license application for the Borssele/Zeeland site. Next scheduled check: 19 Jan 2027.