Projects / Netherlands · Announced
Thorizon One first commercial molten-salt reactor in Zeeland
Thorizon and its partners in an April 2026 cooperation agreement target a commercial molten-salt reactor in Zeeland, the Netherlands, by 2034.
Current status
- How current
- General record check . Bounded evidence review . None of the 4 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- No map pin is shown for this record.
- Expected for this stage but not recorded as a structured fact: Site location recorded as disclosed (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- Molten salt reactor. How it works, with a 3D view.
View on the map · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
The parties include the Province of Zeeland, EPZ, Thorizon, NRG PALLAS, Invest-NL and others. The Borssele location was studied earlier. ANVS's SMR page, fetched 5 October 2026, lists Thorizon One at 250 MWth (100 MWe) among four orienting consultations and states that no Dutch initiative has chosen a location or entered pre-application. The developer paper supports the linked design's 250 MWth / approximately 100 MWe rating; no project plant total is assigned. No final site or license is established.
Key facts
- Design
- Thorizon One (SMR)
- Technology
- Molten salt reactor (MSR) · molten salt
- Operator(s)
- Not recorded
- Vendor for linked design
- Thorizon
- Location
- Borssele location (studied) · Netherlands · precision: region only
Searchable without an invented map pin. - Coordinates
- Region only, no map pin
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 13 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
Thorizon One first commercial molten-salt reactor in Zeeland is recorded at Borssele location (studied), Zeeland, Netherlands. Operator: No operator is recorded. Recorded vendor: Thorizon. Stage: Announced. Location precision: region only; region only, no map pin.
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 250 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Reactor supplier
- Vendor for the linked designThorizon
- Contractor
Source-backed project statement The Province of Zeeland's 17 April 2026 announcement says the cooperation agreement's first milestone is a non-nuclear molten-salt test facility and the Thorizon PILOT program in 2027, involving Schelde Exotech in Zeeland and VDL Groep in Noord-Brabant. Thorizon's technical paper lists company partnerships including Tractebel for engineering and Hyundai Engineering and Construction for civil structure and plant construction, without tying them to a Zeeland contract. None is a signed construction contract for Thorizon One. Provincie Zeeland: Zeeland in view for Europe's first commercial molten salt reactor; Thorizon: cartridge-core molten salt reactor technical paper
- Fuel
- Project fuel information is described in the source-backed statement below.
Source-backed project statement Thorizon's technical paper says Thorizon One's initial commercial target is to receive and burn plutonium and minor actinides separated by reprocessing light-water-reactor spent fuel, through collaboration with Orano and existing infrastructure mainly in France, and lists Orano as its fuel-cycle and reprocessing partner. This is a planned fuel-cycle collaboration, with no contract, quantity or delivery stated for Zeeland. Thorizon: cartridge-core molten salt reactor technical paper
Not found in the sources we checked (3): Customer or offtaker; Funding and government decisions; Comparable schedule revision
- Customer or offtaker
The Province of Zeeland's 17 April 2026 announcement says Thorizon One would supply CO2-free electricity and/or industrial heat, and Thorizon's technical paper describes the same purposes, but neither names a utility, factory or heat buyer. EPZ is discussed as a possible owner and operator, which is not a customer role. Provincie Zeeland: Zeeland in view for Europe's first commercial molten salt reactor; Thorizon: cartridge-core molten salt reactor technical paper
- Funding and government decisions
Thorizon's technical paper reports company financing, a €16 million Series A led by Invest-NL in March 2025, €14 million of regional subsidies and a €10 million France 2030 grant, and the Province of Zeeland's 17 April 2026 page says regional development companies intend to invest in Thorizon and Invest-NL intends to keep supporting it. None of these is an amount allocated to building or licensing the Zeeland reactor. Thorizon: cartridge-core molten salt reactor technical paper; Provincie Zeeland: Zeeland in view for Europe's first commercial molten salt reactor
- Comparable schedule revision
Comparable schedule revision not established. Thorizon's technical paper targets the start of Thorizon One construction by 2032, and the Province of Zeeland's 17 April 2026 announcement dates realisation of Thorizon One in Zeeland to 2034. These are different milestones, construction start and realisation, each stated once, so they are not an earlier and a later date for the same milestone. ANVS says no Dutch initiative has yet chosen a location. Provincie Zeeland: Zeeland in view for Europe's first commercial molten salt reactor; Thorizon: cartridge-core molten salt reactor technical paper; ANVS, Small modular reactors
Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
- Operator or intended licensed owner
- Reviewed 20 Oct 2026: not disclosed in the reviewed evidence.
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(7 notes)
- Evidence review. The Province of Zeeland page describes Thorizon One as a commercial molten-salt reactor of 100 MWe in Zeeland, to be realized from 2034, after a cooperation agreement. A suitability study had looked at Borssele, and EPZ will investigate a role as owner and operator. ANVS lists Thorizon One at 250 MWth (100 MWe) among four orienting consultations and says no Dutch initiative has chosen a location or entered pre-application. The 100 MWe figure is not stored as a plant rating. PIONEER at Petten is a different project. The provincial university grant on the same page is for project NUCLEUS, not this reactor. The participating organizations retain only their source-supported roles; a reactor operator is not assigned from the study, proposer, parent, existing-fleet or proposed-owner relationship. Last checked 20 Oct 2026. Provincie Zeeland: Zeeland in view for Europe's first commercial molten salt reactor; ANVS, Small modular reactors
What would change this
An ANVS pre-application that names a Zeeland location and a committed output for Thorizon One. Next scheduled check: 20 Jan 2027.
- Site location recorded as disclosed: Not disclosed in the reviewed evidence. The province says a suitability study was done earlier for the location in Borssele, and the commercial reactor is described as in Zeeland. ANVS says no Dutch initiative has chosen a location. The stored location is region only, with no pin. Last checked 20 Oct 2026. Provincie Zeeland: Zeeland in view for Europe's first commercial molten salt reactor; ANVS, Small modular reactors
What would change this
A filing that selects Borssele or another Zeeland plot. Next scheduled check: 20 Jan 2027.
- Operator or intended licensed owner: Not disclosed in the reviewed evidence. The reviewed sources establish other participant roles, but do not appoint the recorded party as this reactor’s operator. The operator remains unassigned; this does not assert that no operator exists. Last checked 20 Oct 2026. Provincie Zeeland: Zeeland in view for Europe's first commercial molten salt reactor
What would change this
A project-specific filing, operating agreement or developer statement explicitly names the proposed reactor operator. Next scheduled check: 20 Jan 2027.
- Next decision and prerequisites. The April 2026 memorandum targets realisation of Thorizon One, a 100 MWe molten-salt reactor in Zeeland, by 2034, with the partners pursuing European Investment Bank financing; before a full safety review, ANVS requires the initiator to choose a location and supply site-specific documentation for pre-application consultation. The 2034 date is a target and no site has been chosen. Last checked 23 Oct 2026. Thorizon MoU news — PIONEER and Thorizon One (23 April 2026); ANVS, Small modular reactors
What would change this
A Thorizon One site choice and the start of ANVS pre-application consultation, or an EIB financing decision. Next scheduled check: 23 Apr 2027.
- Permissions and public process. The Dutch nuclear regulator ANVS's SMR page, fetched 5 October 2026, lists Thorizon One (250 MWth, 100 MWe) among four initiatives in orienting consultations, and says none has yet chosen a location, so pre-application consultation has not started. Orienting consultation explains requirements and procedure; it is not a license application. The page describes no public procedure for a Zeeland plant. Last checked 23 Oct 2026. ANVS, Small modular reactors
What would change this
The start of ANVS pre-application consultation for Thorizon One at a named Zeeland site. Next scheduled check: 23 Apr 2027.
- Site dependencies (land, grid, water). Thorizon's April 2026 memorandum release says Thorizon and EPZ, operator of the Borssele nuclear plant, completed a pre-feasibility assessment validating the Borssele site's suitability, and that EPZ is investigating becoming Thorizon One's owner, licensee and operator; the memorandum advances validation of a Zeeland site. ANVS said in October 2026 that no initiative had chosen a location. A pre-feasibility study is not a secured site, grid or water arrangement. Last checked 23 Oct 2026. Thorizon MoU news — PIONEER and Thorizon One (23 April 2026); Provincie Zeeland: Zeeland in view for Europe's first commercial molten salt reactor
What would change this
A site decision for Thorizon One or an EPZ agreement to host and operate it at Borssele. Next scheduled check: 23 Apr 2027.
- Spent fuel, waste and closure: Not disclosed in the reviewed evidence. Thorizon's April 2026 memorandum release and the Province of Zeeland's announcement describe Thorizon One's schedule, partners and output, and say the reactor is designed to run on high-level nuclear waste, but neither says how its spent fuel salt or waste would be stored or disposed of, or by whom. Thorizon's technical paper treats spent-salt handling as a general design challenge. Last checked 23 Oct 2026. Thorizon MoU news — PIONEER and Thorizon One (23 April 2026); Thorizon: cartridge-core molten salt reactor technical paper
What would change this
An EPZ or Thorizon licensing or environmental document describing Thorizon One's waste management. Next scheduled check: 23 Apr 2027.
Evidence dates
(0 of 4 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(4)
- Provincie Zeeland: Zeeland in view for Europe's first commercial molten salt reactor (government, accessed 2 Oct 2026)
- ANVS, Small modular reactors (regulator, accessed 5 Oct 2026)
- Thorizon: cartridge-core molten salt reactor technical paper (company, accessed 13 Oct 2026)
- Thorizon MoU news — PIONEER and Thorizon One (23 April 2026) (company, accessed 2 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Thorizon One first commercial molten-salt reactor in Zeeland — https://smrmap.com/projects/thorizon-zeeland/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Thorizon One first commercial molten-salt reactor in Zeeland”. Record reviewed 13 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/thorizon-zeeland/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.