MK60
Light-water SMR from Deep Atomic, built on pressurized water reactor principles by the developer's account: 200 MW thermal, converted to 60 MW electricity plus 60 MW for cooling, per the developer's page (read via the Wayback Machine).
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- Announced: Deep Atomic MK60 AI data-center campus proposal at INL.
- Evidence
- One source, from its vendor: Deep Atomic: MK60 SMR. Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
Deep Atomic, the developer, says the MK60 is built on pressurized water reactor principles and uses conventional PWR components. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s)
- Deep Atomic
- Module electrical
- 60 MWe (gross/net unspecified)
- Module thermal
- 200 MWth (nameplate; basis unspecified)
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- Deep Atomic MK60 AI data-center campus proposal at INL — Announced · United States
Design sources
(1)
- Deep Atomic: MK60 SMR (company, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. Deep Atomic's MK60 page (Wayback capture of 28 June 2025; page copyright 2024 Deep Atomic AG) presents the MK60 as a small modular reactor built on pressurized water reactor (PWR) principles, using conventional PWR components and standard LEU fuel, sized for the power and cooling demands of data centers. It states that the reactor generates 200 MW thermal, converted to 60 MW electricity plus 60 MW for cooling; these are per-reactor figures and the electrical basis (gross or net) is not stated. The page gives no design, licensing or availability status. It does not name Idaho National Laboratory or any site, so the linked INL data-center proposal is not connected by this source. The stored Deep Atomic vendor, light-water coolant (consistent with the PWR description) and 200 MWth / 60 MWe ratings, with no stated basis, match the page; the page does not say whether the PWR is integral, so the family is PWR, which makes no integral claim, and it does not state the stored thermal neutron spectrum. Last checked 19 Oct 2026. Deep Atomic: MK60 SMR
What would change this
A current Deep Atomic design or regulatory document (for example an NRC pre-application record) or an INL/DOE announcement naming the MK60 for the data-center campus. Next scheduled check: 19 Jan 2027.
- Technology family. Deep Atomic, the developer, says the MK60 is built on pressurized water reactor principles and uses conventional PWR components. Last checked 3 Nov 2026. Deep Atomic: MK60 SMR
What would change this
A Deep Atomic document or a regulator page that states the MK60 reactor type or layout. Next scheduled check: 3 Feb 2027.