Projects / United States · Announced
Deep Atomic MK60 AI data-center campus proposal at INL
A Deep Atomic-led consortium proposed to DOE an AI data-center campus at Idaho National Laboratory that would later incorporate the MK60 light-water SMR (200 MWt, 60 MWe).
Current status
- How current
- General record check . Bounded evidence review . None of the 3 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
The proposal responded to DOE's September 2025 request for applications. DOE had not announced a selection in the sources opened.
Key facts
- Design
- MK60 (SMR)
- Technology
- Pressurized water reactor (PWR) · light water. Deep Atomic, the developer, says the MK60 is built on pressurized water reactor principles and uses conventional PWR components.
- Operator(s)
- Not recorded
- Vendor for linked design
- Deep Atomic
- Location
- Idaho National Laboratory (proposed AI data-center campus) · United States · precision: town or locality only
The proposal is for a campus at Idaho National Laboratory; no facility or plot inside the laboratory is named. The pin is the recorded OpenStreetMap point for the laboratory at its Central Facilities Area (43.5306324, −112.94046): a laboratory-wide point, not a project site. - Coordinates
- 43.5306324, -112.94046 · town-level point (approximate)
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
Deep Atomic MK60 AI data-center campus proposal at INL is recorded at Idaho National Laboratory (proposed AI data-center campus), Idaho, United States. Operator: No operator is recorded. Recorded vendor: Deep Atomic. Stage: Announced. Location precision: town or locality only; town-level point (approximate).
Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: 'Idaho National Laboratory, East Ogden Avenue, Central Facilities Area' (amenity=research_institute), 43.5306324, −112.94046
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 200 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Project proposer or applicant
- Project proposerDeep Atomic · source
- Reactor supplier
- Vendor for the linked designDeep Atomic
- Contractor
Source-backed project statement Data Center Dynamics reported on 2 December 2025 that the INL campus proposal is being developed by a Deep Atomic-led consortium including Parker Tide, Clayco, Gleeds, Paragon Energy Solutions, EvapCo Dry Cooling, Bedrock Labs, Azimuth Renewables, Future-Tech and MoonliteAI. Clayco's 12 February 2026 release says it provides early-stage delivery planning and constructability analysis for the consortium's DOE submissions, with the INL facility still pending DOE approval. These are proposal-stage partners, not a DOE selection or a construction contract. DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL; Clayco: supports Deep Atomic consortium with DOE submissions
- Site host or owner
- Site hostIdaho National Laboratory · source
Not found in the sources we checked (4): Customer or offtaker; Funding and government decisions; Fuel; Comparable schedule revision
- Customer or offtaker
Data Center Dynamics reported on 2 December 2025 that Deep Atomic's consortium proposed an integrated nuclear-powered AI data-center campus at Idaho National Laboratory and that, if approved, it could be a model for federal campuses, national labs, cloud providers and private operators. The campus is the proposed load, and the article, Clayco's 12 February 2026 release and DOE's September 2025 notice name no buyer of its power or cooling. DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL
- Funding and government decisions
DOE's 8 September 2025 notice says lease projects at the INL site would be solely funded by the applicants, which is a program condition, not a funding commitment. Neither that notice, Data Center Dynamics' 2 December 2025 report nor Clayco's 12 February 2026 release states an amount, funder or financing close for Deep Atomic's INL campus proposal. DOE: Energy Department seeks proposals for AI data centers at INL; Clayco: supports Deep Atomic consortium with DOE submissions
- Fuel
- No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.
Data Center Dynamics' 2 December 2025 report describes the MK60 as a light-water SMR with 60 MW of electricity and 200 MW of thermal output. That is a design description. Neither it, Clayco's 12 February 2026 release nor DOE's September 2025 notice names a fuel supplier, quantity or delivery for an MK60 at INL. DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL
- Comparable schedule revision
Comparable schedule revision not established. DOE's 8 September 2025 notice set 7 November 2025 for initial applications, Data Center Dynamics reported the proposal's submission on 2 December 2025 with data-center operations possible within 24 to 36 months on other power, and Clayco said on 12 February 2026 that DOE approval was pending. These are a deadline, a submission and a pending status, not two dates for one construction or operation milestone. DOE: Energy Department seeks proposals for AI data centers at INL; DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL; Clayco: supports Deep Atomic consortium with DOE submissions
Not recorded in SMRMap's reviewed evidence (2): Operator or intended licensed owner; Programs and agreements naming the project
- Operator or intended licensed owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(6 notes)
- Evidence review. Data Centre Dynamics reported on 2 December 2025 that Deep Atomic submitted a proposal to DOE for a nuclear-powered AI data-center campus at Idaho National Laboratory in Idaho Falls. The article describes the MK60 as providing 200 MW of thermal output and, in the company's words, 60 MW of electricity and 60 MW of cooling. Clayco's 12 February 2026 release says the INL facility is pending DOE approval. DOE's own 8 September 2025 notice is the request for proposals and does not announce a selection. No plot inside INL, fuel contract or financing close is named. The stored MK60 design and announced stage stay. The 60 MW and 200 MW figures are the article's description of the MK60, not a selected campus total, and they are not stored. Last checked 19 Oct 2026. DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL; Clayco: supports Deep Atomic consortium with DOE submissions; DOE: Energy Department seeks proposals for AI data centers at INL
What would change this
A DOE selection or rejection of the Deep Atomic INL proposal would change this record. Next scheduled check: 19 Jan 2027.
- Site location recorded as disclosed: Not disclosed in the reviewed evidence. The proposal is for a campus at Idaho National Laboratory. No facility or plot inside the laboratory is named. Last checked 19 Oct 2026. DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL; Clayco: supports Deep Atomic consortium with DOE submissions
What would change this
A DOE selection naming the INL site would settle the location. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. The next decision shown is DOE's evaluation and approval of Deep Atomic's INL campus proposal, which Clayco described as pending DOE approval in February 2026; DCD reported that the MK60 would then need design certification, fabrication and commissioning. The sources read report no DOE selection or date. Last checked 23 Oct 2026. Clayco: supports Deep Atomic consortium with DOE submissions; DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL
What would change this
DOE's announcement of selections for INL AI data-center leases. Next scheduled check: 23 Apr 2027.
- Permissions and public process. DCD reported on 2 December 2025 that Deep Atomic's consortium submitted a proposal to DOE's Office of Nuclear Energy for an AI data-center campus at INL that would later add its MK60 SMR after design certification. Clayco's February 2026 release says the INL facility was pending DOE approval. DOE's 2025 solicitation says proposals are judged partly on plans to meet regulatory and permitting requirements. A proposal under evaluation is not a lease, permit or license, and no public process is recorded. Last checked 23 Oct 2026. DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL; Clayco: supports Deep Atomic consortium with DOE submissions; DOE: Energy Department seeks proposals for AI data centers at INL
What would change this
A DOE selection or lease decision on the Deep Atomic proposal, or an NRC filing for the MK60. Next scheduled check: 23 Apr 2027.
- Site dependencies (land, grid, water). DOE's 2025 solicitation offers long-term leases on part of about 44,000 acres identified at INL, and says applicants must secure utility interconnection agreements for new generation. DCD reported that Deep Atomic's proposal would start data-center operations on grid, geothermal and solar power before the MK60 is added. No lease award, specific parcel or interconnection agreement for this proposal is shown in these sources. Last checked 23 Oct 2026. DOE: Energy Department seeks proposals for AI data centers at INL; DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL
What would change this
A DOE lease award naming the Deep Atomic campus site, or an interconnection agreement. Next scheduled check: 23 Apr 2027.
- Spent fuel, waste and closure: Not disclosed in the reviewed evidence. DOE's 2025 solicitation says applicants would be responsible for building, operating and decommissioning their projects, but neither it nor the December 2025 DCD report or Clayco's February 2026 release says who would manage MK60 spent fuel or how it would be stored or disposed of. Last checked 23 Oct 2026. DOE: Energy Department seeks proposals for AI data centers at INL
What would change this
A DOE lease, NEPA document or license application describing spent-fuel handling for the MK60 at INL. Next scheduled check: 23 Apr 2027.
Evidence dates
(0 of 3 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(3)
- DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL (news report, accessed 2 Oct 2026)
- Clayco: supports Deep Atomic consortium with DOE submissions (company, accessed 2 Oct 2026)
- DOE: Energy Department seeks proposals for AI data centers at INL (government, accessed 2 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Deep Atomic MK60 AI data-center campus proposal at INL — https://smrmap.com/projects/deep-atomic-mk60-inl/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Deep Atomic MK60 AI data-centre campus proposal at INL”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/deep-atomic-mk60-inl/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.