Designs / dsn-dhr400

Yanlong DHR-400

CNNC pool-type low-temperature heating reactor, rated at 400 MW thermal in Qian Tianlin’s CET2022 presentation. The presentation explicitly includes DHR-400 among small modular reactor heating demonstrations. It describes a Liaoyuan proposal with 2022 first-concrete and 2024 operation targets; these are historical targets, not achieved milestones. Electrical generation and present commercial availability are unverified.

Catalogue identity snapshot: 2022 (CET2022 presentation; current availability unverified). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Class
SMR
Technology
Other
Coolant
light water
Spectrum
unknown
Developer / vendor(s) as of 2022
China National Nuclear Corporation
Module electrical
thermal only (no MWe)
Module thermal
400 MWth (nameplate; basis unspecified)
Fuel form
UO2 pellet / 17x17 square
Inclusion basis
smr_by_design_class
Confidence
medium
Last verified
2026-10-13

Tracked deployment projects

Design sources