Liaoyuan DHR-400 heating demonstration proposal

Historical CNNC district-heating demonstration proposal in Liaoyuan, Jilin, named in Qian Tianlin’s CET2022 small modular reactor presentation. The DHR-400 design is rated at 400 MW thermal; a plant total and module count are not assigned. First concrete in 2022 and operation in 2024 were targets in that presentation, not proof of construction or operation. Present activity, parcel and intended operator are unverified. No relationship to an earlier Xudabao proposal or the unnamed 2018 Yantai heating agreement is assumed.

What this record says

Last verified 2026-10-13. This is a record review date, not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Site and deployment

Liaoyuan DHR-400 heating demonstration proposal is recorded at Liaoyuan DHR-400 demonstration location (undisclosed), Jilin, China. Operator: No operator is recorded. Vendor for a linked design: China National Nuclear Corporation. Stage: Announced. Location precision: undisclosed.

Capacity

This project is recorded as thermal only (no MWe). Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 400 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Permission recorded

Latest supported development

No actual dated development is recorded.

Next documented milestone

No next milestone date is recorded.

Material unknowns

Stage
Announced
Design
Yanlong DHR-400 (SMR)
Technology
Other · light water
Operator(s)
Not recorded
Vendor for linked design
China National Nuclear Corporation
Location
Liaoyuan DHR-400 demonstration location (undisclosed) · China · precision: undisclosed
City named in the CET2022 presentation; no selected parcel or coordinates established.
Coordinates
undisclosed / not plotted
Electrical capacity
thermal only (no MWe) · scope: plant
Thermal capacity
Not recorded
Modules planned
—
Inclusion basis
historical_smr_program
Confidence
medium
Last verified
2026-10-13 (publication/verification date)

Milestones & dated events

Regulatory actions

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Sources