Kurchatov Institute’s automated, upgraded thermoelectric heating-plant design commissioned by Rosatom. Rosatom describes ELENA-AM within its small modular reactor programme; its 2024 annual report records technical-design work. The 2023 description gives a water-cooled, water-moderated system and a 7 MW thermal design with at least 200 kW electric generation. Those dated figures are not assigned as universal current module ratings. Original ELENA is a separate historical configuration; neither its rating nor its proposed Popov Island site is inherited.
- Class
- SMR
- Technology
- Other
- Coolant
- light water
- Spectrum
- unknown
- Developer / vendor(s)
- NRC “Kurchatov Institute”
- Inclusion basis
- smr_by_design_class
- Confidence
- medium
- Last verified
- 2026-10-13
Tracked deployment projects
- First ELENA-AM thermoelectric heating pilot proposal — Announced · Russia
Design sources
- Rosatom: The Return of Elena (company_primary, published Sep 2023, accessed 2026-10-13)
- Rosatom: The future of small modular reactors (company_primary, accessed 2026-10-13)
- Rosatom public annual report 2024: small-reactor technical designs (company_primary, accessed 2026-10-13)