NRC “Kurchatov Institute”
The ARIS status report dated 2024-10-17 identifies NRC “Kurchatov Institute” as the designer of ELENA. This is a dated attribution; current corporate status and ownership have not been verified.
- Projects
- Announced: First ELENA-AM thermoelectric heating pilot proposal. 2 designs.
- Evidence
- One source (IAEA/NEA): ARIS original status report — ELENA (2024-10-17). Record reviewed 2 Oct 2026.
Key facts · Designs · Tracked projects · Ownership · Milestones · Sources · Its projects in the table · Who is involved
Key facts
- Organization type
- Research, Reactor developer
- Category
- research institution
- Country
- Russia
- Confidence
- medium
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current activity)
All fields
(5 without a known value)
- Aliases
- None recorded in this release
- Listing status
- Unknown (no listing is recorded here; this does not mean the organization is private)
- Exchange / ticker
- None recorded in this release
- Ownership / control
- Unknown (no owner or controller is recorded here)
- Website
- None recorded in this release
Linked designs
Tracked deployment projects
1 linked project record: 1 announced, counting every project that names this organization in any recorded role (vendor, operator or participant); the developer table counts only projects that use its designs. These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- First ELENA-AM thermoelectric heating pilot proposal — Announced · Russia
Recorded link: vendor/developer field, project proposer · project record checked 13 Oct 2026 · timeline · permission status · sources
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- No organization-level milestones recorded. See the linked project timelines for dated developments and targets.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
(1)
- ARIS original status report — ELENA (2024-10-17) (IAEA/NEA, accessed 2 Oct 2026)