ENHS (Encapsulated Nuclear Heat Source)
Lead-bismuth-cooled reactor module of 125 MWt and a nominal 50 MWe, which IAEA-TECDOC-1536 (2007) describes as fabricated, fueled and sealed in the factory (feasibility or early conceptual stage). This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source (IAEA/NEA): IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 2007 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead bismuth
- Spectrum
- Fast
- Developer / vendor(s) as of 2007
- University of California, Berkeley, Lawrence Livermore National Laboratory
- Module electrical
- 50 MWe (gross/net unspecified)
- Module thermal
- 125 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007) (IAEA/NEA, accessed 3 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. IAEA-TECDOC-1536 (January 2007), Annex XX, describes the Encapsulated Nuclear Heat Source as a factory-fueled modular lead-bismuth reactor. Table XX-1 gives a nominal 125 MW(th) and 50 MW(e), with stated upgrade paths to 180 MW(th) and 75 MW(e). The overview places the design at feasibility or early conceptual design and says ENHS-specific R&D is at the University of California, Berkeley and Lawrence Livermore National Laboratory. The same annex names a wider study team. No site or license is stated. Stored ratings, lead-bismuth coolant, LFR family, and fast spectrum match the annex and were not edited. Last checked 20 Oct 2026. IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007)
What would change this
A post-2007 Berkeley or LLNL statement that this ENHS concept moved past early conceptual design or named a site. Next scheduled check: 20 Jan 2027.