University of California, Berkeley
Named by IAEA sources as developer of the Mk1 PB-FHR (IAEA 2020) and a co-developer of the ENHS concept (IAEA-TECDOC-1536). Attribution is dated; current corporate status has not been verified.
- Projects
- No projects tracked here. 2 designs.
- Evidence
- 2 sources; first primary source: IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition). Record reviewed 3 Oct 2026.
Key facts · Designs · Tracked projects · Ownership · Milestones · Sources · Who is involved
Key facts
- Organization type
- Reactor developer, Research
- Category
- research institution
- Country
- United States
- Confidence
- medium
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current activity)
All fields
(5 without a known value)
- Aliases
- None recorded in this release
- Listing status
- Unknown (no listing is recorded here; this does not mean the organization is private)
- Exchange / ticker
- None recorded in this release
- Ownership / control
- Unknown (no owner or controller is recorded here)
- Website
- None recorded in this release
Linked designs
- Mk1 PB-FHR — Fluoride-salt-cooled high-temperature reactor (FHR) · SMR
- ENHS (Encapsulated Nuclear Heat Source) — Lead-cooled fast reactor (LFR) · SMR
Tracked deployment projects
- No projects tracked here.
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- No organization-level milestones recorded.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
(2)
- IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition) (IAEA/NEA, accessed 3 Oct 2026)
- IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007) (IAEA/NEA, accessed 3 Oct 2026)