Gravity

Deep Fission's pressurized-water SMR for a deep borehole. Its generic FAQ states a target up to 15 MWe, with gross/net unstated. The July 2026 public NSDA describes the Gravity pilot's planned demonstration up to 19.5 MWt and uses that maximum rated power in its safety analysis. That pilot-specific thermal bound is not achieved output or proof of a fixed electrical rating. The NSDA separates early safety alignment from later startup and operating decisions. No source here equates Gravity with the catalog DFBR-1 configuration.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Projects
Siting: Deep Fission Gravity pilot, Parsons.
Evidence
3 sources; first primary source: Deep Fission Gravity reactor FAQ. Record reviewed 2 Oct 2026.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Key facts

Class
SMR
Technology
Pressurized water reactor (PWR)
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s)
Deep Fission
Module electrical
up to 15 MWe (gross/net unspecified)
Fuel form
conventional LEU PWR fuel
Enrichment
LEU
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(1 without a known value)
Module thermal
Not recorded

Tracked deployment projects

Agreements naming this design (2)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(3)

Evidence and open questions

(1 note)
  • Evidence review. Deep Fission's FAQ describes the Gravity Nuclear Reactor as an SMR based on established pressurized water reactor (PWR) technology, using standard 2x2 and 3x3 LEU fuel assemblies, placed about one mile underground in a deep vertical borehole to produce electricity; each reactor is targeted to produce up to 15 MWe, with the gross or net basis unstated. The public Gravity pilot Nuclear Safety Design Agreement (Revision 0, issued 17 July 2026 and approved by DOE letter dated 14 July 2026) says the pilot will start at zero-power criticality and then demonstrate power operation up to 19.5 MWt, a pilot-specific thermal bound rather than an achieved output or a fixed commercial rating. The NSDA establishes early alignment with DOE on safety-basis expectations on the path toward DOE authorization; it is not itself a startup or operating authorization. Deep Fission's Parsons page says that, subject to DOE authorization under the Reactor Pilot Program, the reactor is to be demonstrated at its site in the Great Plains Industrial Park, which connects the linked Parsons pilot deployment; commercial operation would need a separate NRC license. The stored Deep Fission vendor, light-water coolant, LEU fuel and up-to-15 MWe rating with no stated gross or net basis match the sources; the sources call the design a PWR (the stored family), do not state the stored thermal spectrum, and the 19.5 MWt pilot bound is not stored as a module rating. Last checked 19 Oct 2026. Deep Fission Gravity reactor FAQ; Deep Fission: public Gravity pilot Nuclear Safety Design Agreement, Revision 0; Deep Fission Parsons project page
    What would change this

    A DOE authorization to start up or operate the Gravity pilot at Parsons, or a Deep Fission NRC application stating the commercial Gravity rating and its basis. Next scheduled check: 19 Jan 2027.