HTR-PM600
Multi-module pebble-bed HTGR plant using six HTR-PM reactor modules (250 MWt each) feeding one turbine, about 650 MWe per the designers. Capacity check: the plant total exceeds 300 MWe; it is a modular multi-module plant. HTR-PM parameters are not transferred.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- Siting: CNEC / Zheneng Sanmen HTGR power station.
- Evidence
- One source (peer-reviewed): Strategic Study of CAE: HTR-PM600 (Zhang Zuoyi et al., 2019). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s)
- China National Nuclear Corporation
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- CNEC / Zheneng Sanmen HTGR power station — Siting · China
Design sources
(1)
- Strategic Study of CAE: HTR-PM600 (Zhang Zuoyi et al., 2019) (peer-reviewed, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The 2019 Strategic Study of CAE article by INET, Tsinghua University authors says China is working on the design of a 600 MW-class pebble-bed HTGR, the HTR-PM600, aimed at cogeneration of electricity and heat for domestic and international markets. Its overall scheme uses the same pebble-bed reactor module as HTR-PM, with six modules feeding one turbine-generator for a plant scale of 650 MWe; 650 MWe is a plant total, and the article states no separate per-module rating for HTR-PM600, although it gives 250 MWt per reactor module for the HTR-PM demonstration. As dated by that 2019 article, the HTR-PM600 technical scheme was to be completed so that the first unit could be ready to start by the end of the 13th Five-Year Plan, with the first unit to be built before 2025; these are historical targets, not achieved milestones. The article names no site, so the linked Sanmen HTGR proposal is not connected by this source. The stored HTGR family is consistent with the article's pebble-bed HTGR description, but the article does not state helium coolant or a thermal spectrum for HTR-PM600 itself, does not name CNNC as its developer, and gives no per-module rating, which stays unassigned. Last checked 19 Oct 2026. Strategic Study of CAE: HTR-PM600 (Zhang Zuoyi et al., 2019)
What would change this
An HTR-PM600 design or licensing document (for example an NNSA construction-license notice for an HTR-PM600 plant) stating the per-module thermal rating, the developer and the site. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The 2019 CAE article gives only the plant scale: six pebble-bed modules feeding one turbine-generator for 650 MWe, a plant total that is not a per-module rating. It says the modules are the same as HTR-PM's and elsewhere puts the HTR-PM module at 250 MWt, but it never states a per-module rating for HTR-PM600 itself, so no module rating is proposed; the coordinator could decide that the stated module identity is enough to carry 250 MWt. Last checked 19 Oct 2026. Strategic Study of CAE: HTR-PM600 (Zhang Zuoyi et al., 2019)
What would change this
An HTR-PM600 design document or licensing notice stating the per-module thermal power. Next scheduled check: 19 Jan 2027.