JAY-1
Space reactor concept from Canadian Strategic Missions Corporation for lunar and space infrastructure, compact enough for lunar landers. The developer presents it separately from its LEUNR prototype program and does not say how the two relate, so they are kept separate. Coolant and output are not published by the developer.
- Reactor type
- No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
- Projects
- No projects tracked here.
- Evidence
- One source, from its vendor: CSMC: Nuclear. Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Key facts
- Class
- Microreactor
- Technology
- Other (see description)
- Developer / vendor(s)
- Canadian Strategic Missions Corporation
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Coolant (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(4 without a known value)
- Coolant
- Not recorded
- Spectrum
- Not recorded
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- CSMC: Nuclear (company, accessed 2 Oct 2026)
Evidence and open questions
(4 notes)
- Evidence review. The Canadian Strategic Missions Corporation nuclear page describes JAY-1 as a space reactor for lunar and later space infrastructure, including habitats, scientific facilities, and resource extraction, and says it is compact enough for lunar landers. The same page describes POLAR-1 and ORCA-1 as different reactors. It does not state JAY-1 coolant, neutron spectrum, or a power rating, and it does not mention LEUNR. No license or named project site is stated. POLAR-1's 2028 criticality target was not applied to JAY-1. Last checked 20 Oct 2026. CSMC: Nuclear
What would change this
A CSMC specification that states JAY-1 coolant, spectrum, and power, and how it relates to LEUNR. Next scheduled check: 20 Jan 2027.
- Coolant: Not disclosed in the reviewed evidence. The JAY-1 paragraph does not name a coolant. Last checked 20 Oct 2026. CSMC: Nuclear
What would change this
A CSMC data sheet naming the JAY-1 coolant. Next scheduled check: 20 Jan 2027.
- Neutron spectrum: Not disclosed in the reviewed evidence. The JAY-1 paragraph does not say thermal, fast, or epithermal. Last checked 20 Oct 2026. CSMC: Nuclear
What would change this
A CSMC sentence naming the JAY-1 neutron spectrum. Next scheduled check: 20 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The JAY-1 paragraph gives no electrical or thermal megawatt figure. POLAR-1 is described as megawatt-scale and is a different reactor. Last checked 20 Oct 2026. CSMC: Nuclear
What would change this
A CSMC power figure that names JAY-1. Next scheduled check: 20 Jan 2027.