Designs / dsn-jereh-micro-reactor
Jereh Micro Reactor (JMR)
The IAEA September 2026 microreactor outlook names JMR as Jereh Micro Reactor. Its Figure 5 places the concept at 10 MWth and conceptual design, with the molten-salt colour code. The document does not identify a developer organization or country; these remain unknown. No deployment, site or permission is recorded. A catalogue concept is not a built reactor.
- Class
- Microreactor
- Technology
- Molten salt reactor (MSR)
- Coolant
- unknown
- Spectrum
- unknown
- Developer / vendor(s)
- —
- Module thermal
- 10 MWth (nameplate; basis unspecified)
- Inclusion basis
- microreactor_labeled
- Confidence
- medium
- Last verified
- 2026-10-08
Tracked deployment projects
- No projects tracked here.
Design sources
- IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016 (iaea_or_nea, accessed 2026-10-06)