KARAT-100
NIKIET boiling-water reactor listed in the IAEA's 2020 SMR booklet as a conceptual design of 360 MWt and 100 MWe. This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- Boiling water reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source (IAEA/NEA): IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 2020 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Boiling water reactor (BWR)
- Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 2020
- NIKIET
- Module electrical
- 100 MWe (gross/net unspecified)
- Module thermal
- 360 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition) (IAEA/NEA, accessed 3 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The 2020 IAEA booklet is hosted at aris.iaea.org, so only coolant and the stated design status were used. The text calls KARAT-100 a boiling water reactor and says it is developed to the level of conceptual design. Ratings, the integral-type wording, the developer, and the application sentence were not used as answers. No non-ARIS source was captured. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition)
What would change this
A non-ARIS NIKIET source that names KARAT-100 and states rating, fuel, and spectrum. Next scheduled check: 20 Jan 2027.