How small reactor types work · Designs of this type

How a boiling water reactor works

BWRX-300 is a boiling water reactor (BWR): the core itself makes the steam, and that steam leaves the reactor vessel for the turbine with no steam generator in between.[1, pp. 25, 26, 27]

This page explains the type on one documented design, simplified; other designs of the type can differ. It describes the design, not a project: see the BWRX-300 record. SMRMap tracks 18 projects using it, and each project's record carries its status.

Follow BWRX-300 in three steps

Read with the diagram, or open 3D to highlight each step. This describes one design, not every boiling water reactor.

1. Steam starts in the core

In BWRX-300, steam forms in the core. Natural circulation moves the coolant through it.[1, p. 26]

2. Steam leaves for the turbine

Steam passes the separators and dryer before leaving the vessel for the turbine.[1, p. 26] The dashed return paths in the drawing are illustrative: the section's text does not describe the route back to the core.[1, pp. 25–30]

3. Find the projects using this design

This is a simplified design illustration. Each project's record carries its own progress, permissions and evidence limits.

Open BWRX-300 and its project records

BWRX-300 boiling water reactor, simplified side section with numbered partsA tall reactor vessel with, from bottom to top, control rods and drives, the core, a tall chimney, steam separators and a steam dryer. Arrows rise from the core through the chimney, separators and dryer, then leave the vessel through a steam outlet on the right. Dashed arrows run back down between the internals and the vessel wall, and one dashed arrow enters from the side at the top of the chimney; they are drawn only to close the loop.1234567Core in, 240 °CCore out, 288 °CTo the turbine
Simplified from the IAEA SMR Technology Catalogue 2026, BWRX-300 section (printed pages 25–30). Parts and proportions not stated in the source are schematic. Heights of the parts inside the vessel are schematic; the vessel's height and diameter are the catalog's. The order of the parts from bottom to top follows the catalog's drawing on printed page 25. Numbers match the sections below; arrows show the coolant path.
  • Water and steam, on the route the section's text gives
  • Not described in the section's text: drawn only to close the loop

The parts, numbered as in the figure

1. Reactor pressure vessel

The catalog's table gives the vessel as 27 m high and 4 m in diameter, weighing 650 metric tons.[1, p. 25] It has a removable head.[1, p. 27] The chimney, steam separators and steam dryer are all inside it.[1, p. 27] Isolation valves flanged directly to the vessel are fitted on all of its flow paths larger than 25 mm.[1, p. 26]

2. Core

The core is a vertical cylinder of low-enriched uranium fuel, with 240 fuel assemblies on a square lattice.[1, pp. 25, 26] Natural circulation drives the flow through it.[1, p. 26]

3. Control rods and drives

Control rods go in and out from the bottom of the core.[1, p. 26] Fine motion drives move them during normal operation and can insert them quickly by hydraulics in an emergency.[1, p. 27]

4. Chimney

A tall chimney inside the vessel supports natural circulation for cooling the core.[1, p. 26] The section credits the relatively tall vessel with the driving force for that circulation.[1, p. 27]

5. Steam separators

Steam separators take out the water carried along with the steam.[1, p. 26]

6. Steam dryer

The steam dryer also removes that water, before the steam leaves the vessel.[1, p. 26]

7. Steam outlet to the turbine

The dried steam leaves the vessel and flows to the steam turbine.[1, p. 26]

The coolant path

  1. Gravity and thermal buoyancy circulate the water, so no pump moves it through the core.[1, p. 27]
  2. The table lists the coolant at 240 °C entering the core and 288 °C leaving it.[1, p. 25]
  3. Steam from the core passes the separators and the dryer, which remove the water it carries, then leaves the vessel for the turbine.[1, p. 26]
  4. The section's text does not describe the route water takes back to the core.[1, pp. 25–30]
  5. Its drawing labels feedwater nozzles on the vessel wall at the top of the chimney but shows no route, so the dashed lines in the figure only close the loop.[1, p. 25]

Where are the steam generators and the recirculation pumps?

BWRX-300 has neither, and it has no separate pressurizer either.[1, p. 27] This is BWRX-300. Other boiling water reactors can differ, and the interactive view shows BWRX-300 only.

  • Steam generators. The reactor's own steam goes to the turbine, so the section says it does not need steam generators.[1, p. 27]
  • Pumps. Natural circulation moves the coolant through the core, which the section says removes the need for recirculation pumps, the pumps that would otherwise push water through the core.[1, p. 26]
  • Pressurizer. Pressure is managed through the vessel's large water and steam inventory, together with the turbine control and bypass valves.[1, p. 27]

Design values

These are values listed in the catalog section, which the developer supplied.[1, p. 25]

  • Power. 870 MW(t) of heat and 300 MW(e) of electricity in the table; the text calls the electrical figure approximate and net, for a plant making electricity only.[1, p. 25]
  • Primary pressure. 7.17 MPa in the reactor vessel; the table gives it as the primary, reactor-side value only.[1, p. 25]
  • Coolant temperature. 240 °C at the core inlet and 288 °C at the core outlet.[1, p. 25]
  • Fuel. Enrichment under 4.95%, with fuel cycles of 12 to 24 months.[1, pp. 25, 26]

Designs on SMRMap recorded as this type

4 designs, with 18 tracked projects between them. Each design's type comes from its own record on SMRMap; the example above is one of them, and the others can differ from it.

DesignClassElectrical output Tracked projects
BWRX-300SMR300 MWe (net) · module18
KARAT-100SMR100 MWe (gross/net unspecified) · moduleNone tracked here
KARAT-45SMR—None tracked here
VK-300SMR250 MWe (gross/net unspecified) · moduleNone tracked here

Sources

  1. Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) — IAEA ARIS (catalog host; profiles supplied by contributors). BWRX-300 section, printed pages 25–30. Each section is contributor material; the BWRX-300 section was supplied by GE Vernova Hitachi Nuclear Energy.