KARAT-45

NIKIET boiling-water reactor listed in the IAEA's 2016-2020 SMR booklets as a conceptual design; the 2020 edition gives 180 MWt and 45-50 MWe and describes shop fabrication in modular, transportable form. This dated design profile does not establish current development, a deployment site or any regulatory permission.

Reactor type
Boiling water reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
One source (IAEA/NEA): IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition). Record reviewed 3 Oct 2026.
Schematic of BWRX-300, this type's example. A tall reactor vessel with, from bottom to top, control rods and drives, the core, a tall chimney, steam separators and a steam dryer.
Schematic of BWRX-300, this type's example.

Catalog identity snapshot: 2020 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Boiling water reactor (BWR)
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 2020
NIKIET
Module thermal
180 MWth (nameplate; basis unspecified)
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
3 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(1 without a known value)
Module electrical
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(1)

Evidence and open questions

(1 note)
  • Evidence review. The 2020 IAEA booklet is hosted at aris.iaea.org, so only coolant and the stated design status were used. The introduction calls KARAT-45 a small boiling water reactor. The parameter block places Conceptual Design immediately before the design-status label and before the KARAT-45 introduction. Power, enrichment, developer, and application sentences were not used. No non-ARIS source was captured. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition)
    What would change this

    A non-ARIS NIKIET source that names KARAT-45 and states its rating, fuel, and spectrum without relying on this booklet. Next scheduled check: 20 Jan 2027.