Mk1 PB-FHR
UC Berkeley's pebble-bed fluoride-salt-cooled high-temperature reactor, listed in the IAEA's 2016-2020 SMR booklets as a small modular pre-conceptual design of 236 MWt and 100 MWe. A separate design from Kairos Power's KP-FHR. This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- Fluoride salt-cooled high-temperature reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 2 sources; first primary source: IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 2020 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Fluoride-salt-cooled high-temperature reactor (FHR)
- Coolant
- Molten salt
- Spectrum
- Thermal
- Developer / vendor(s) as of 2020
- University of California, Berkeley
- Module electrical
- 100 MWe (net)
- Module thermal
- 236 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition) (IAEA/NEA, accessed 3 Oct 2026)
- FHR@UCB: Mk1 PB-FHR design parameters (academic, accessed 20 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The 2020 booklet sentences already on this record stay limited to classification: graphite moderation, flibe coolant, TRISO fuel in a graphite matrix, thermal-spectrum fuel cycles, and pre-conceptual status. They are not used for the rating, the developer, the purpose, or a deployment. The UC Berkeley FHR parameter page names the Mark 1 pebble-bed FHR as a pre-conceptual design, states reactor thermal power of 236 MWth, and states base-load net electrical output of 100 MWe. The co-firing net figure of 241.8 MWe is a different operating mode and is not the base-load rating. The page footer copyright names FHR@UCB and UC Berkeley. It names no site. The eScholarship PDF of Andreades et al., Nuclear Technology 2016, returned an access refusal (HTTP 403) and was not read. Stored thermal power stays 236 MWth. Stored electrical power stays 100 MWe, and only its basis is proposed to change from nameplate unspecified to net. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition); FHR@UCB: Mk1 PB-FHR design parameters
What would change this
The Andreades et al. Nuclear Technology 2016 paper, DOI 10.13182/NT16-2, whose eScholarship PDF returned an access refusal (HTTP 403) on 2026-10-20, if it names a deployment site or an author affiliation beyond this parameter page. Next scheduled check: 20 Jan 2027.