MN-350 Mobile Power Module
Mobile microreactor of 350 kW electric in a 20-foot container for military and off-grid use. It shares a chief executive with MobileNuclear Energy, whose release of 20 May 2025 says it renamed its MN-1 Mobile Power Module the MN-350 Mobile Power Module to reflect 350 kWe. No source read here states that Scaled Atomics took over that design, so the two records are kept separate.
- Reactor type
- No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
- Projects
- No projects tracked here.
- Evidence
- 2 sources; first primary source: Scaled Atomics: MN-350 Mobile Power Module. Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Key facts
- Class
- Microreactor
- Technology
- Other (see description)
- Developer / vendor(s)
- Scaled Atomics
- Module electrical
- 0.35 MWe (gross/net unspecified)
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Coolant (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(3 without a known value)
- Coolant
- Not recorded
- Spectrum
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- Scaled Atomics: MN-350 Mobile Power Module (company, accessed 2 Oct 2026)
- MobileNuclear Energy: new name for flagship microreactor system, MN-350 Mobile Power Module (20 May 2025) (company, published 20 May 2025, accessed 14 Oct 2026)
Evidence and open questions
(3 notes)
- Evidence review. The Scaled Atomics page describes the MN-350 as deployable continuous power in a 20-foot container for military missions, with a 10-year planned refueling interval. It does not state a coolant, a neutron spectrum, or a megawatt figure. The Oak Ridge and Tennessee sentences describe the company. The page is marked 2026. The contact line was not used. MobileNuclear Energy's release of 20 May 2025 says it renamed its flagship mobile microreactor from MN-1 Mobile Power Module to MN-350 Mobile Power Module. It does not name Scaled Atomics, and this page does not name MobileNuclear, so the link between the two is not established. The records are not merged. Last checked 20 Oct 2026. Scaled Atomics: MN-350 Mobile Power Module; MobileNuclear Energy: new name for flagship microreactor system, MN-350 Mobile Power Module (20 May 2025)
What would change this
A Scaled Atomics specification that names the MN-350 coolant, spectrum, and power. Next scheduled check: 20 Jan 2027.
- Coolant: Not disclosed in the reviewed evidence. The MN-350 paragraphs do not name a coolant. Last checked 20 Oct 2026. Scaled Atomics: MN-350 Mobile Power Module
What would change this
A Scaled Atomics sentence naming the MN-350 coolant. Next scheduled check: 20 Jan 2027.
- Neutron spectrum: Not disclosed in the reviewed evidence. The MN-350 paragraphs do not say thermal, fast, or epithermal. Last checked 20 Oct 2026. Scaled Atomics: MN-350 Mobile Power Module
What would change this
A Scaled Atomics sentence naming the MN-350 neutron spectrum. Next scheduled check: 20 Jan 2027.