Morpheus
Nuclea Energy's lead-cooled reactor, stated at 10 MWt. The developer's electrical range is not recorded here.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- Announced: Nuclea Morpheus test reactor siting at the Utah San Rafael Energy Lab. Development status as stated: conceptual design stage.
- Evidence
- 2 sources; first primary source: Nuclea Energy: Morpheus. Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Key facts
- Class
- Microreactor
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead
- Developer / vendor(s)
- Nuclea Energy
- Module thermal
- 10 MWth (nameplate; basis unspecified)
- Development status (as stated)
- conceptual design stage
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Spectrum
- Not recorded
- Module electrical
- Not recorded
Tracked deployment projects
- Nuclea Morpheus test reactor siting at the Utah San Rafael Energy Lab — Announced · United States
Design sources
(2)
- Nuclea Energy: Morpheus (company, accessed 2 Oct 2026)
- newsfilecorp.com: Morpheus (company, published 30 Jul 2026, accessed 14 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. A 30 July 2026 Newsfile release says Nuclea Energy is developing the Morpheus microreactor, a lead-cooled, graphite-moderated, factory-built design then in the conceptual design stage, scalable from about 3.5 MWe to 50 MWe. The same release ties the design to electricity for data centers, defense installations and remote sites. It does not state a neutron spectrum, a single module rating, or a thermal power. The stored 10 MWth figure does not appear in this text. The Nuclea home capture is only the company name and does not describe the reactor. No sentence names the Utah San Rafael site. Last checked 19 Oct 2026. newsfilecorp.com: Morpheus
What would change this
A Nuclea design sheet that states the neutron spectrum in words and a single reference module output with a gross or net basis. Next scheduled check: 19 Jan 2027.
- Neutron spectrum: Not disclosed in the reviewed evidence. The release says lead-cooled and graphite-moderated. It does not say thermal, fast or epithermal. Graphite moderation is not recorded here as a spectrum value. Last checked 19 Oct 2026. newsfilecorp.com: Morpheus
What would change this
A Nuclea technical page that names the Morpheus neutron spectrum. Next scheduled check: 19 Jan 2027.