Projects / United States · Announced

Nuclea Morpheus test reactor siting at the Utah San Rafael Energy Lab

Nuclea Energy's Morpheus is an announced test reactor proposal for the Utah San Rafael Energy Lab in Orangeville, Utah.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Lead-cooled fast reactor. How it works, with a 3D view.
Schematic of BREST-OD-300, this type's example. A wide vessel, cut in section, has a central cavity holding the core low down, and a cavity on each side holding a steam generator and a pump.
Schematic of BREST-OD-300, this type's example.

Description

Utah's Office of Energy Development and Nuclea Energy signed an agreement in 2026 to explore siting a Morpheus test reactor at the Utah San Rafael Energy Lab in Orangeville. Distinct from the Ward 250 record at the same lab.

Key facts

Design
Morpheus (Microreactor)
Technology
Lead-cooled fast reactor (LFR) · lead
Operator(s)
Not recorded
Vendor for linked design
Nuclea Energy
Design origin
Canada: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Utah San Rafael Energy Lab · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Center of the map embedded on the lab's own About page, labeled 'San Rafael Energy Research Center' (39.2394, -111.0893). Lab-area point, not a surveyed reactor pad. Replaces an earlier road-centroid geocode.
Coordinates
39.2394, -111.0893 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Nuclea Morpheus test reactor siting at the Utah San Rafael Energy Lab is recorded at Utah San Rafael Energy Lab, Utah, United States. Operator: No operator is recorded. Recorded vendor: Nuclea Energy. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate). Other records at this site: Valar Atomics Ward 250, NuCube test microreactor at the Utah San Rafael Energy Lab.

Coordinate source: Utah San Rafael Energy Lab: about us (embedded map), Center of the map embedded on the lab's About page, labeled 'San Rafael Energy Research Center' (39.2394, -111.0893)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 10 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Reactor supplier
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

Utah News Dispatch reported on 6 August 2026 that Utah's Office of Energy Development and Nuclea signed an agreement to explore siting a Morpheus test reactor at the San Rafael Energy Lab, describing Morpheus as an option for clean electricity generation. The article names no buyer or user of the test reactor's power. Utah News Dispatch: compact transportable nuclear reactor agreement

Contractor

Utah News Dispatch reported on 6 August 2026 that Utah's Office of Energy Development signed a memorandum with Nuclea in early June to explore siting a Morpheus test reactor at the San Rafael Energy Lab, and that Utah will support the company as it engages with DOE and the NRC. That is a host-state siting and support agreement with the vendor, not a contractor appointment. No engineering, licensing or construction contractor is named. Utah News Dispatch: compact transportable nuclear reactor agreement

Funding and government decisions

Utah News Dispatch's 6 August 2026 article states no amount, funder or award for the Morpheus siting agreement. A linked headline about development costs belongs to a different article on earlier Utah agreements. Utah News Dispatch: compact transportable nuclear reactor agreement

Fuel
No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.

Utah News Dispatch's 6 August 2026 article describes Morpheus as a factory-built, transportable reactor and names no fuel type, supplier, quantity or delivery for the Orangeville test. The saved Nuclea home page contains only the company name. Utah News Dispatch: compact transportable nuclear reactor agreement; Nuclea Energy: Morpheus

Comparable schedule revision

Comparable schedule revision not established. Utah News Dispatch's 6 August 2026 article dates the memorandum to early June and says factory-built modules could be installed in months, a duration. It gives no construction or operation date, so there is nothing to revise. Utah News Dispatch: compact transportable nuclear reactor agreement

Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(4 notes, 1 not yet reviewed)
  • Evidence review. Utah News Dispatch on 6 August 2026 reported that the Utah Office of Energy Development and Nuclea Energy signed an agreement to explore siting a Morpheus test reactor, and that a memorandum of understanding was signed in early June. The article says the agreement aims to explore a site at the Utah San Rafael Energy Lab in Orangeville. It quotes a company range of about 3.5 MWe to 50 MWe, which is not stored as a plant rating. The Nuclea home capture is an 18-character shell and is an access limit, so no 10 MWt figure is taken from it or from the pack note. No operator is named. The stored design, vendor, empty output, and announced stage stay. Last checked 19 Oct 2026. Nuclea Energy: Morpheus; Utah News Dispatch: compact transportable nuclear reactor agreement
    What would change this

    A readable Nuclea or Utah page, or a DOE or NRC filing, that states the test-reactor rating, operator, and whether the Orangeville lab site was selected. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. The August 2026 report describes the agreement's next steps as exploring a test-reactor site at the San Rafael Energy Lab and Nuclea engaging with DOE and the NRC, with Utah's support; Nuclea's chief executive said the partnership should accelerate its deployment schedule. No dates, site decision or regulatory filing are given. Last checked 23 Oct 2026. Utah News Dispatch: compact transportable nuclear reactor agreement
    What would change this

    A Nuclea site decision at the lab or a regulatory filing for the test reactor. Next scheduled check: 23 Apr 2027.

  • Permissions and public process: Not disclosed in the reviewed evidence. Utah News Dispatch reported on 6 August 2026 that, under the agreement signed in early June, Utah will support Nuclea Energy as it engages with the U.S. Department of Energy and the NRC. The report names no application, authorization request, environmental review or public meeting for a Morpheus test reactor at the San Rafael Energy Lab. Last checked 23 Oct 2026. Utah News Dispatch: compact transportable nuclear reactor agreement
    What would change this

    A DOE or NRC filing for a Morpheus test reactor in Utah, or a public meeting on the Orangeville siting. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). Utah News Dispatch reported on 6 August 2026 that the agreement between Utah's Office of Energy Development and Nuclea Energy aims to explore a site for a Morpheus test reactor at the Utah San Rafael Energy Lab in Orangeville. Exploring a site is not a lease or site selection, and the report describes no plot, utility or water arrangement. Last checked 23 Oct 2026. Utah News Dispatch: compact transportable nuclear reactor agreement
    What would change this

    A site agreement or lease for a Morpheus test reactor at the San Rafael Energy Lab. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 2 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.2 of 2 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(2)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Nuclea Morpheus test reactor siting at the Utah San Rafael Energy Lab — https://smrmap.com/projects/nuclea-morpheus-usrel/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Nuclea Morpheus test reactor siting at the Utah San Rafael Energy Lab”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/nuclea-morpheus-usrel/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.