NuSun-1

Heat-pipe cooled TRISO-fueled microreactor platform. Output is not recorded because the developer does not say whether its figure is thermal or electrical.

Reactor type
Heat-pipe microreactor. How it works, with a 3D view.
Projects
Announced: NuCube test microreactor at the Utah San Rafael Energy Lab.
Evidence
One source, from its vendor: NuCube Energy technology. Record reviewed 2 Oct 2026.
Schematic of eVinci, this type's example. A horizontal canister holds a graphite core block with rows of fuel compacts, with control drums above and below it and shutdown rods coming in from the left.
Schematic of eVinci, this type's example.

Key facts

Class
Microreactor
Technology
Other (see description)
Coolant
Other (see description)
Developer / vendor(s)
NuCube Energy
Fuel form
TRISO
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(3 without a known value)
Spectrum
Not recorded
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(1)

Evidence and open questions

(3 notes)
  • Evidence review. NuCube Energy's technology page describes the NuSun platform as a solid-state reactor with heat-pipe cooling, no core cooling pumps and no pressurized vessel, using TRISO fuel, for industrial heat, combined heat and power, or electricity through thermophotovoltaic cells. It states no megawatt figure and does not say thermal, fast or epithermal. It does not name a deployment site. Stored empty ratings and unknown spectrum match what this page leaves unstated. The page identifies NuCube Energy as the company. Last checked 19 Oct 2026. NuCube Energy technology
    What would change this

    A NuCube specification that gives one NuSun-1 output with units and a named neutron spectrum. Next scheduled check: 19 Jan 2027.

  • Neutron spectrum: Not disclosed in the reviewed evidence. The page says heat-pipe cooling and TRISO fuel. It does not name the neutron spectrum. Last checked 19 Oct 2026. NuCube Energy technology
    What would change this

    A NuCube technical note that states whether NuSun-1 is thermal, fast or epithermal. Next scheduled check: 19 Jan 2027.

  • Module rating: Not disclosed in the reviewed evidence. The page describes output modes but no thermal or electrical megawatt value. No number is added. Last checked 19 Oct 2026. NuCube Energy technology
    What would change this

    A NuCube datasheet with a NuSun-1 power in MW and a gross, net or thermal basis. Next scheduled check: 19 Jan 2027.